BLD-Final | 5/15/2001 | 5/16/2001 | 5/16/2001 | A | PASS |
Carl Dependahl
|
|
|
###-####, ok to sign at office, arch's letter ok for hvac sign off (not req'd)5/16/2001 1:43:50 PM 5/16/2001 1:44:58 PM 5/16/2001 1:46:46 PM
|
BLD-Conference | 5/15/2001 | 5/15/2001 | 5/15/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/15/2001 9:27:50 AM w/arch...need hvac na'd in office or?
|
BLD-Final | 5/9/2001 | 5/9/2001 | 5/9/2001 | P | FAIL |
Carl Dependahl
|
|
|
###-####need htg, plans onsite 5/9/2001 2:41:05 PM
|
FIRE-Final Inspection | 5/8/2001 | 5/8/2001 | 5/8/2001 | P | PASS |
Rick Jackson
|
|
|
###-#### terry
|
FIRE-Final Inspection | 5/4/2001 | 5/4/2001 | 5/4/2001 | P | FAIL |
Rick Jackson
|
|
|
###-#### need calrification on phase 2 area not part of permit 5/7/2001 7:12:40 AM
|
FIRE-Final Inspection | 5/1/2001 | 5/2/2001 | 5/2/2001 | A | FAIL |
Rick Jackson
|
|
|
###-#### exit signs; fire extinguishers; alarm and fire sprinkler signs; door hardware 5/2/2001 9:56:48 AM
|
BLD-Final | 4/30/2001 | 5/1/2001 | 5/1/2001 | A | FAIL |
Carl Dependahl
|
|
|
###-####, nr 5/1/2001 2:26:25 PM
|
BLD-Framing/Rough-in | 3/27/2001 | 3/27/2001 | 3/27/2001 | P | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Conference | 3/23/2001 | 3/23/2001 | 3/23/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/23/2001 11:31:22 AM w/ Terry of sundance const; need complete detail for 1hr rated closure of entry area, consult arch...seal elec penetrations at existing shaft
|
BLD-Framing/Rough-in | 3/20/2001 | 3/21/2001 | 3/21/2001 | A | FAIL |
Jim Storey
|
|
|
fr insp terry-- ###-#### c/n on site/ 3/21/2001 3:15:31 PM
|
BLD-Framing/Rough-in | 3/19/2001 | 3/20/2001 | 3/20/2001 | A | NR |
Carl Dependahl
|
|
|
###-####; recall, need elec 1st 3/20/2001 9:59:04 AM
|