BLD-Final | 3/16/2001 | 3/16/2001 | 3/16/2001 | P | PASS |
Jim Sly
|
|
|
GARAGE DOOR IS OPEN ###-#### C/C issued. 3/16/2001 4:06:16 PM
|
BLD-Final | 3/16/2001 | 3/16/2001 | 3/16/2001 | P | PASS |
Jim Sly
|
|
|
GARAGE DOOR IS OPEN ###-#### C/C issued. 3/16/2001 4:06:16 PM
|
BLD-Energy code compliance | 2/6/2001 | 2/7/2001 | 2/7/2001 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 2/6/2001 | 2/7/2001 | 2/7/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### shear panel hold downs and framing corrections all have been completed
2/7/2001 11:51:08 AM
|
BLD-Framing/Rough-in | 2/1/2001 | 2/5/2001 | 2/5/2001 | P | PART |
Dave Hannah
|
|
|
Chuck ###-#### c/n on site ok to insulate 2/5/2001 3:55:29 PM
|
BLD-Framing/Rough-in | 2/1/2001 | 2/2/2001 | 2/2/2001 | A | FAIL |
Dave Hannah
|
|
|
shear Chuck ###-#### 2/2/2001 9:56:36 AM c/n on site 2/2/2001 9:56:53 AM
|
BLD-Foundation | 1/17/2001 | 1/17/2001 | 1/17/2001 | P | PASS |
Dave Hannah
|
|
|
Dane ###-####
|
BLD-Footing | 1/16/2001 | 1/16/2001 | 1/16/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 05:38:03. Contact: ###-####.
|