BLD-Final | 3/15/2001 | 3/15/2001 | 3/15/2001 | P | PASS |
Jim Sly
|
|
|
###-#### ###-#### C/C issued. 3/15/2001 4:13:26 PM
|
BLD-Final | 3/8/2001 | 3/8/2001 | 3/8/2001 | P | FAIL |
Dave Hannah
|
|
|
key on top of water heater ###-#### need elec final 3/8/2001 2:58:27 PM
|
BLD-Energy code compliance | 2/6/2001 | 2/6/2001 | 2/6/2001 | P | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 2/5/2001 | 2/6/2001 | 2/6/2001 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 2/2/2001 | 2/5/2001 | 2/5/2001 | P | FAIL |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 2/1/2001 | 2/2/2001 | 2/2/2001 | A | PART |
Dave Hannah
|
|
|
Chuck ###-#### ok to side 2/2/2001 10:39:00 AM
|
BLD-Foundation | 1/17/2001 | 1/17/2001 | 1/17/2001 | P | PASS |
Jim Sly
|
|
|
Dane ###-####
|
BLD-Footing | 1/16/2001 | 1/16/2001 | 1/16/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 05:39:09. Contact: ###-####.
|