BLD-Final | 3/8/2001 | 3/8/2001 | 3/8/2001 | P | PASS |
Dave Hannah
|
|
|
###-#### key on top of water heater 3/8/2001 2:53:36 PM
|
BLD-Energy code compliance | 2/6/2001 | 2/7/2001 | 2/7/2001 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 2/6/2001 | 2/7/2001 | 2/7/2001 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 2/1/2001 | 2/5/2001 | 2/5/2001 | P | PART |
Dave Hannah
|
|
|
Chuck ###-#### c/n on site ok to insulate after
they get a mec rough in 2/5/2001 4:45:27 PM
|
BLD-Framing/Rough-in | 2/5/2001 | 2/5/2001 | 2/5/2001 | P | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 2/5/2001 4:46:05 PM shear pannel
|
BLD-Framing/Rough-in | 2/1/2001 | 2/2/2001 | 2/2/2001 | A | FAIL |
Dave Hannah
|
|
|
shear Chuck ###-#### c/n issued 2/2/2001 10:20:09 AM
|
BLD-Foundation | 1/11/2001 | 1/12/2001 | 1/12/2001 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Footing | 1/11/2001 | 1/11/2001 | 1/11/2001 | P | PART |
Jim Sly
|
|
|
Dane ###-####
|