BLD-Final | 4/4/2001 | 4/4/2001 | 4/4/2001 | P | PASS |
Dave Hannah
|
|
|
Pete ###-#### ele has been finaled
|
BLD-Final | 2/27/2001 | 2/27/2001 | 2/27/2001 | P | NR |
Dave Hannah
|
|
|
###-#### no elec final 2/27/2001 2:34:01 PM
|
BLD-Framing/Rough-in | 2/7/2001 | 2/8/2001 | 2/8/2001 | A | PASS |
Dave Hannah
|
|
|
Pete ###-#### crew has added four new roof joist along side four that had been cut in the top cord by fire department bearing points are good fire blocking on east bearing wall ok crew working on west wall ok to insulate and close up roof
2/8/2001 9:46:30 AM
|
BLD-Framing/Rough-in | 1/17/2001 | 1/18/2001 | 1/18/2001 | A | PASS |
Dave Hannah
|
|
|
Pete ###-####
|