BLD-Final | 6/19/2001 | 6/20/2001 | 6/20/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 17:59:03. Contact: ###-####. C/C issued. 6/20/2001 8:11:17 AM
|
BLD-Final | 6/18/2001 | 6/19/2001 | 6/19/2001 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/18/2001 at 17:50:39. Contact: ###-####. post address seal fr door in garage 6/19/2001 1:00:34 PM
|
BLD-Energy code compliance | 4/30/2001 | 5/1/2001 | 5/1/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/30/2001 at 14:24:27. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/27/2001 | 4/27/2001 | 4/27/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/27/2001 at 09:01:13. Contact: ###-####. C/N issued. 4/27/2001 7:13:07 PM
|
BLD-Framing/Rough-in | 4/26/2001 | 4/26/2001 | 4/26/2001 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/26/2001 at 09:25:00. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/18/2001 | 4/18/2001 | 4/18/2001 | P | PART |
Jim Sly
|
|
|
shear wall lorin ###-#### reinspection Shear OK 4/18/2001 8:01:33 PM
|
BLD-Framing/Rough-in | 4/17/2001 | 4/17/2001 | 4/17/2001 | P | FAIL |
Jim Sly
|
|
|
shear wall lorin ###-#### C/N issued 4/17/2001 8:21:26 PM
|
BLD-Foundation | 2/12/2001 | 2/13/2001 | 2/13/2001 | A | PASS |
Jim Sly
|
|
|
###-#### Builder to post bond for driveway not completed. 2/13/2001 9:34:02 AM
|
BLD-Foundation | 2/9/2001 | 2/12/2001 | 2/12/2001 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/09/2001 at 13:38:11. Contact: ###-####. No humans on site or forms UP. 2/12/2001 2:42:24 PM
|
BLD-Footing | 2/9/2001 | 2/9/2001 | 2/9/2001 | P | PART |
Jim Sly
|
|
|
Warren ###-####
|