BLD-Final | 3/15/2001 | 3/16/2001 | 3/16/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/15/2001 at 09:10:55. Contact: ###-####. ok for perm occ 3/16/2001 1:45:33 PM
|
Permanent Occupancy | | 3/16/2001 | 3/16/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/15/2001 | 3/15/2001 | 3/15/2001 | P | PASS |
Joe Tawney
|
|
|
Reinsp OK for permanant occupancy 3/16/2001 8:22:26 AM
|
BLD-Final | 3/4/2001 | 3/5/2001 | 3/5/2001 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/04/2001 at 14:38:24. Contact: ###-####.
|
BLD-Other | 3/4/2001 | 3/5/2001 | 3/5/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/04/2001 at 14:39:11. Contact: ###-####.ceiling grid. 3/5/2001 10:46:43 AM
|
FIRE-Final Inspection | 3/4/2001 | 3/5/2001 | 3/5/2001 | A | FAIL |
Joe Tawney
|
|
|
Final Fail C/N issued 3/5/2001 12:30:45 PM
|
BLD-Other | 2/28/2001 | 3/1/2001 | 3/1/2001 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/28/2001 at 09:17:59. Contact: ###-####. needs slsck wire on lights 3/1/2001 11:15:16 AM
|
BLD-Framing/Rough-in | 2/9/2001 | 2/12/2001 | 2/12/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/09/2001 at 16:04:38. Contact: ###-####.ok to rock,check addnl supports needed for front rounded soffit at final. 2/12/2001 12:39:13 PM
|
BLD-Framing/Rough-in | 2/8/2001 | 2/9/2001 | 2/9/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/08/2001 at 13:47:48. Contact: ###-####.c/n to support the soffit construction by other means than the t-bar grid.also obtain ele insp. 2/9/2001 2:57:02 PM
|