BLD-Final | 1/6/2003 | 1/6/2003 | 1/6/2003 | | DONE |
|
|
|
Approved for final/Russ Owen.
|
Permanent Occupancy | | 5/30/2002 | 5/30/2002 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 5/30/2002 | | PASS |
|
|
|
ok signed off
|
BLD-Final | 2/7/2002 | 2/7/2002 | 2/7/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 2/7/2002 12:05:42 PM Ok temp oc needs all other required sign offs for perm oc. 2/7/2002 12:13:24 PM
|
BLD-Final | 1/15/2002 | 1/15/2002 | 1/15/2002 | P | NR |
Russ Owen
|
|
|
dirk ###-#### fnneeds to post a bond. 1/22/2002 11:24:44 AM
|
FIRE-Final Inspection | 1/14/2002 | 1/14/2002 | 1/14/2002 | P | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 1/14/2002 4:55:41 PM fire life/safety finaled
|
BLD-Framing/Rough-in | 1/8/2002 | 1/9/2002 | 1/9/2002 | P | PART |
Russ Owen
|
|
|
|
BLD-Aging Inspection | 11/20/2001 | 11/20/2001 | 11/20/2001 | | PART |
Russ Owen
|
|
|
wip. 11/26/2001 3:32:53 PM
|
BLD-Concrete | 9/19/2001 | 9/20/2001 | 9/20/2001 | A | PASS |
Tom Arcoraci
|
|
|
###-#### RON grout 9/20/2001 8:40:54 AM
|
BLD-Concrete | 9/14/2001 | 9/17/2001 | 9/17/2001 | A | PART |
Russ Owen
|
|
|
###-#### RON 1st lift 9/17/2001 10:52:29 AM
|
BLD-Foundation | 8/22/2001 | 8/22/2001 | 8/22/2001 | P | PASS |
Russ Owen
|
|
|
###-#### dirk will pour at 2pm
|
BLD-Footing | 8/21/2001 | 8/21/2001 | 8/21/2001 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/21/2001 at 07:53:13. Contact: ###-####.
|