Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-00126
StatusFinaled
Name GORMAN -TUTT BUILDERS
Site Address 344 W HIGHLAND ST
Project NameDENISE PLACE
Customer Number389-5775
ePlanReviewNo
Description
PLAN TYPE H-2 * TO CONSTRUCT A NEW 1,941 SQ.FT. TWO BEDROOM, TWO AND ONE-HALF BATH, THREE STORY, SINGLE FAMILY HOME. THE THIRD FLOOR IS 559 SQ.FT. THE SECOND FLOOR IS 1,340 SQ.FT AND THE FIRST FLOOR IS 42.SQ.FT WITH A 662 SQ.FT ATTACHED GARAGE. ALL WORK PER THE APPROVED PLANS AND ATTACHED CONDITION LIST. MJP P.C. # 029
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/10/20016/11/20016/11/2001AFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 06/10/2001 at 21:38:15. Contact: ###-####. C/N issued-smoke seal needed on fire door. 6/11/2001 10:21:31 AM
BLD-Final6/11/20016/11/20016/11/2001PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 06/11/2001 at 10:21:59. Contact: ###-####.
BLD-Final6/8/20016/8/20016/8/2001PFAIL
DetailsJim Storey
randy-- ###-#### fn occ deck cannot incroch into p/l setback 2nd floor west side. 6/8/2001 2:49:36 PM
BLD-Wall cover4/18/20014/18/20014/18/2001PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/18/2001 at 10:27:47. Contact: ###-####.
BLD-Wall cover4/16/20014/17/20014/17/2001AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/16/2001 at 23:19:16. Contact: ###-####. ele light box in return air/ flue chase not fire blk./ roof framing calls for ladder framing between girders. 4/17/2001 11:10:41 AM
BLD-Framing/Rough-in4/12/20014/13/20014/13/2001APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 04/12/2001 at 20:16:44. Contact: ###-####. 4/13/2001 11:50:06 AM ok to insulate c/n on site 4/13/2001 11:50:37 AM
BLD-Framing/Rough-in4/11/20014/11/20014/11/2001PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/11/2001 at 08:13:23. Contact: ###-####.
BLD-Framing/Rough-in3/23/20013/23/20013/23/2001PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/23/2001 at 07:46:53. Contact: ###-####. 420 3/23/2001 2:49:42 PM
BLD-Framing/Rough-in3/23/20013/23/20013/23/2001APASS
DetailsSteven Webb
Scheduled by Inspector: 420 On 3/23/2001 10:28:22 AM shear 3/23/2001 10:30:03 AM
BLD-Foundation2/26/20012/27/20012/27/2001PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/26/2001 at 12:51:13. Contact: ###-####.
BLD-Footing2/26/20012/26/20012/26/2001PPASS
DetailsJim Storey
###-####
BLD-Framing/Rough-in2/26/20012/26/20012/26/2001PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/26/2001 at 07:55:19. Contact: ###-####.
BLD-Footing2/15/20012/16/20012/16/2001ANR
DetailsSteven Webb
###-#### Soil excavated, no wip or no one on site. 2/16/2001 11:34:43 AM