BLD-Final | 4/6/2001 | 4/9/2001 | 4/9/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 04/06/2001 at 13:41:45. Contact: ###-####.
|
BLD-Final | 4/6/2001 | 4/6/2001 | 4/6/2001 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/06/2001 at 08:38:25. Contact: ###-####.
|
FIRE-Final Inspection | 4/5/2001 | 4/6/2001 | 4/6/2001 | P | CANC |
Joe Tawney
|
|
|
4/6/2001 4:09:50 PM Cancel should be structural insp 4/6/2001 4:10:13 PM
|
BLD-Final | 3/29/2001 | 3/30/2001 | 3/30/2001 | A | NR |
Dave Hannah
|
|
|
###-####
|
FIRE-Final Inspection | 3/27/2001 | 3/28/2001 | 3/28/2001 | P | CANC |
Joe Tawney
|
|
|
###-####. Cancel Single family dwelling 3/28/2001 8:25:13 AM
|
BLD-Energy code compliance | 2/22/2001 | 2/23/2001 | 2/23/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### 2/23/2001 9:40:22 AM
|
BLD-Framing/Rough-in | 2/20/2001 | 2/21/2001 | 2/21/2001 | P | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Foundation | 1/23/2001 | 1/24/2001 | 1/24/2001 | A | PASS |
Dave Hannah
|
|
|
Logan ###-####
|
BLD-Conference | 1/23/2001 | 1/23/2001 | 1/23/2001 | P | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 1/23/2001 4:22:22 PM
|
BLD-Footing | 1/20/2001 | 1/22/2001 | 1/22/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/20/2001 at 16:57:52. Contact: ###-####.footings ok. 1/22/2001 10:53:54 AM
|