BLD-Aging Inspection | 7/23/2001 | 7/23/2001 | 7/23/2001 | | PASS |
Jim Storey
|
|
|
final ok special insp. letter archived. card signed and with paul markalena.arch. 7/25/2001 10:43:20 AM
|
BLD-Aging Inspection | 5/21/2001 | 5/21/2001 | 5/21/2001 | | PASS |
Jim Storey
|
|
|
workin progess. 5/21/2001 9:54:13 AM
|
BLD-Wall cover | 3/16/2001 | 3/20/2001 | 3/20/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/16/2001 at 09:38:50. Contact: ###-####. duct wrap req. foil tape/ pipe collor/ ceilling ok. 3/22/2001 4:03:00 PM
|
FIRE-Conference | 3/7/2001 | 3/14/2001 | 3/14/2001 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 03/07/2001 at 10:28:13. Contact: ###-####. this reques was for he structural inspector 3/16/2001 9:30:02 AM
|
BLD-Other | 2/27/2001 | 2/28/2001 | 2/28/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/27/2001 at 06:22:35. Contact: ###-####. ceillingframing ok 2 hr wall framing ok to cover / I beam in coridor must be protected and scurbber duct must br adderssed to maintain coridor tunnel. 2/28/2001 1:31:04 PM
|
BLD-Other | 2/22/2001 | 2/26/2001 | 2/26/2001 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/22/2001 at 10:55:12. Contact: . via phone call from micron. 2/26/2001 4:11:01 PM
|