BLD-Final | 11/19/2001 | 11/19/2001 | 11/19/2001 | P | PASS |
Dave Hannah
|
|
|
fn april-- ###-#### ok for perm occ 11/19/2001 3:25:53 PM
|
Permanent Occupancy | | 11/19/2001 | 11/19/2001 | | DONE |
|
|
|
|
BLD-Final | 11/13/2001 | 11/13/2001 | 11/13/2001 | P | FAIL |
Tom Arcoraci
|
|
|
###-#### call first cn posted 11/13/2001 4:57:15 PM
|
BLD-Final | 11/1/2001 | 11/1/2001 | 11/1/2001 | P | CANC |
Tom Arcoraci
|
|
|
fn insp april ###-####-- call 1st before insp\\CANC BY APRIL
|
FIRE-Final Inspection | 10/10/2001 | 10/10/2001 | 10/10/2001 | P | PASS |
Troy Cobbley
|
|
|
###-#### OK for perm occ. 10/15/2001 1:13:18 PM
|
BLD-Framing/Rough-in | 8/24/2001 | 8/24/2001 | 8/24/2001 | P | PART |
Tom Arcoraci
|
|
|
darrell-- ###-#### fr check drywall to deck at occ sep for office per app plan 8/24/2001 2:32:07 AM
|
BLD-Framing/Rough-in | 8/22/2001 | 8/23/2001 | 8/23/2001 | A | FAIL |
Tom Arcoraci
|
|
|
###-#### no plans 8/22/2001 11:12:38 PM
|
BLD-Aging Inspection | 8/20/2001 | 8/20/2001 | 8/20/2001 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Footing | 6/19/2001 | 6/19/2001 | 6/19/2001 | P | PASS |
Tom Arcoraci
|
|
|
April ###-#### wall ok 3 units 6/19/2001 4:30:55 AM
|
BLD-Footing | 6/15/2001 | 6/18/2001 | 6/18/2001 | A | PASS |
Dave Hannah
|
|
|
garage footing late am\\###-####
|