BLD-Final | 5/30/2001 | 5/31/2001 | 5/31/2001 | P | PASS |
Jim Sly
|
|
|
fn jeff ###-#### fn jeff 86 C/C issued 7-3266 5/31/2001 4:15:56 PM
|
BLD-Energy code compliance | 4/2/2001 | 4/3/2001 | 4/3/2001 | A | PASS |
Jim Sly
|
|
|
jeff ###-####
|
BLD-Framing/Rough-in | 4/2/2001 | 4/3/2001 | 4/3/2001 | A | PASS |
Jim Sly
|
|
|
reinspection Jeff ###-####
|
BLD-Framing/Rough-in | 3/29/2001 | 3/30/2001 | 3/30/2001 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/29/2001 at 17:30:17. Contact: ###-####. 3/30/2001 10:04:30 AM C/N ON SITE OK T 3/30/2001 12:22:02 PM O INSULATE 3/30/2001 12:22:10 PM
|
BLD-Framing/Rough-in | 3/15/2001 | 3/15/2001 | 3/15/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/15/2001 at 07:57:19. Contact: ###-####. shear panels ok to cover 3/15/2001 2:28:24 PM
|
BLD-Framing/Rough-in | 3/14/2001 | 3/14/2001 | 3/14/2001 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/14/2001 at 09:11:09. Contact: ###-####.c/n posted. 3/14/2001 3:32:44 PM
|
BLD-Foundation | 2/15/2001 | 2/15/2001 | 2/15/2001 | P | PASS |
Dave Hannah
|
|
|
WES ###-####
|
BLD-Footing | 2/12/2001 | 2/12/2001 | 2/12/2001 | P | PART |
Jim Sly
|
|
|
###-#### Foot for Bsmnt only OK. 2/12/2001 2:37:43 PM
|