BLD-Final | 7/26/2001 | 7/27/2001 | 7/27/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 07/26/2001 at 15:46:40. Contact: ###-####. issued c.c # 20382 7/27/2001 9:24:54 AM
|
BLD-Final | 7/25/2001 | 7/26/2001 | 7/26/2001 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/25/2001 at 15:24:01. Contact: ###-####.c/n crawl s 7/26/2001 10:06:34 AM pace wall insulation. 7/26/2001 10:06:44 AM
|
BLD-Aging Inspection | 6/27/2001 | 6/27/2001 | 6/27/2001 | | PART |
Jim Sly
|
|
|
called.......still working. 6/27/2001 10:08:18 AM
|
BLD-Energy code compliance | 4/26/2001 | 4/27/2001 | 4/27/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/26/2001 at 07:09:23. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/26/2001 | 4/26/2001 | 4/26/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/26/2001 at 07:08:43. Contact: ###-####.
|
BLD-Wall cover | 4/20/2001 | 4/20/2001 | 4/20/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/20/2001 at 07:11:14. Contact: ###-####. Shear OK. 4/20/2001 11:34:02 AM
|
BLD-Foundation | 3/14/2001 | 3/15/2001 | 3/15/2001 | A | PART |
Dave Hannah
|
|
|
Chris ###-#### 3/15/2001 9:16:43 AM
|
BLD-Footing | 3/14/2001 | 3/14/2001 | 3/14/2001 | P | PART |
Russ Owen
|
|
|
FT INSP--JACK ###-####ok except rebar not in place at garage. 3/14/2001 4:40:21 PM
|