BLD-Final | 4/2/2001 | 4/2/2001 | 4/2/2001 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/02/2001 at 07:17:35. Contact: .c/n ok 4/2/2001 10:09:33 AM
|
BLD-Final | 3/29/2001 | 3/30/2001 | 3/30/2001 | P | CANC |
Russ Owen
|
|
|
###-####recalled for 4/2 unable to make this. 4/2/2001 7:45:39 AM 4/2/2001 7:47:14 AM
|
BLD-Final | 3/23/2001 | 3/26/2001 | 3/26/2001 | A | FAIL |
Tom Arcoraci
|
|
|
###-#### cn issued 3/26/2001 10:42:41 AM
|
BLD-Framing/Rough-in | 2/27/2001 | 2/28/2001 | 2/28/2001 | P | PART |
Tony Young
|
|
|
###-####
ok to insulate and rock after electrical rouph pass 2/28/2001 2:26:26 PM
|
BLD-Framing/Rough-in | 2/8/2001 | 2/9/2001 | 2/9/2001 | A | PART |
Tom Arcoraci
|
|
|
shear panel ###-#### ok to side 2/9/2001 11:30:12 AM
|
BLD-Footing | 2/5/2001 | 2/5/2001 | 2/5/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/5/2001 9:41:10 AM ok to pour if thawed & plbg ok, explained slab insul, ok
|
BLD-Footing | 2/5/2001 | 2/5/2001 | 2/5/2001 | P | PART |
Carl Dependahl
|
|
|
###-####
|
BLD-Footing | 1/29/2001 | 1/30/2001 | 1/30/2001 | P | NR |
Carl Dependahl
|
|
|
###-#### , mono-slab, need plbg r/i...thaw ground & protect concrete from freeze when pouring. 1/30/2001 10:43:58 AM excavation nly looks ok; insulate slab 1/30/2001 10:44:29 AM
|