Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-00197
StatusFinaled
Name HABITEC ARCHITECTS
Site Address 601 W GOWEN RD
Project NameWESTERN POWER SPORTS
Customer Number 
ePlanReviewNo
Description
Western Power Sports * To construct a 106,964 sq. ft. one story with mezzanine type II-N unlimited area shell building. Separate plans and permits are required for the tenant improvements. No occupancy is authorized under this permit. DRH00-00241 The following agreement has been provided from the owner and accepted by Boise City regarding the lack of approval from the FAA. Shoemaker Properties, LLC agress to defend, indemnify and hold harmless Boise City and its agents and employees from any claims, demands, or causes of action brought by the United States Department of Transportation, Federal Aviation Administration which may arise from any contention made by the FAA that Boise City's issuance of a building permit for the project was premature because approval of the FAA was not obtained beforehand. Contruction of this building prior to FAA approval is at the sole risk of the owner.
Area of first floor is 80,482 sq. ft. Mezzanine floor is 26,482 sq. ft. A 60 foot open yard is to maintained around this building. Fire sprinklers are used for the unlimited area.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/2/200110/3/200110/3/2001APASS
DetailsJim Storey
greg ###-#### final ok per approved plan 10/3/2001 9:28:33 AM
BLD-Conference9/4/20019/5/20019/5/2001APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/04/2001 at 17:23:51. Contact: ###-####. gaurd rail at mez work in progress ok. 9/5/2001 9:02:01 AM
FIRE-Final Inspection8/28/20018/28/20018/28/2001APASS
DetailsRick Jackson
Added by Inspector: 409 On 8/28/2001 7:11:33 AM
BLD-Final8/27/20018/27/20018/27/2001PPART
DetailsJim Storey
Added by Inspector: 301 On 8/27/2001 4:32:38 PM temp ok mis. idems posted on c/n on site.
FIRE-Conference8/21/20018/21/20018/21/2001PPART
DetailsRick Jackson
###-#### pat discussed fire lane signage 8/21/2001 2:54:07 PM
BLD-Conference8/10/20018/10/20018/10/2001PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/10/2001 at 07:53:31. Contact: ###-####. need fire for exit sign location. 8/10/2001 1:24:51 PM
BLD-Framing/Rough-in8/8/20018/8/20018/8/2001PPART
DetailsJim Storey
FR ###-####- PAT went trrough racking /handrail c/n 8/8/2001 12:58:16 PM
FIRE-Conference8/8/20018/8/20018/8/2001PPART
DetailsRick Jackson
###-####- FIRE CONF extinguisher placement; requested sprinkler r/i inspection; need bollards at gas meter 8/9/2001 7:58:07 AM
FIRE-Conference8/6/20018/7/20018/7/2001PCANC
DetailsRick Jackson
Pat, ###-####
BLD-Conference8/2/20018/3/20018/3/2001AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/02/2001 at 16:27:18. Contact: ###-####.
BLD-Wall cover7/5/20017/6/20017/6/2001PNR
DetailsJim Storey
###-####
BLD-Framing/Rough-in6/27/20016/28/20016/28/2001APART
DetailsJim Storey
###-#### south east stair must be continous 1 hr membrane and ele heater must be boxed out and fire stopped. 6/28/2001 9:39:11 AM
BLD-Conference6/21/20016/22/20016/22/2001APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/21/2001 at 07:43:44. Contact: ###-####. pending fire proofing special insp. report. 6/22/2001 12:03:26 PM
BLD-Conference6/13/20016/14/20016/14/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/13/2001 at 15:43:29. Contact: ###-####. colum protection special insp. complet beam protection. 6/14/2001 5:30:04 PM
BLD-Conference6/7/20016/7/20016/7/2001PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/07/2001 at 07:38:14. Contact: ###-####. called and will recall. 6/7/2001 2:53:59 PM
BLD-Framing/Rough-in5/16/20015/17/20015/17/2001AFAIL
DetailsJim Storey
roof deck weld insp\\###-#### missing joist to deck attchment/ lap seam at roof drain not attched. 5/17/2001 11:25:23 AM
BLD-Framing/Rough-in4/16/20014/16/20014/16/2001PPART
DetailsJim Storey
###-#### panels pending special insp. report.concrete insp. pw/o insp. 4/16/2001 2:16:13 PM
BLD-Framing/Rough-in4/11/20014/12/20014/12/2001APART
DetailsJim Storey
###-#### tilt slab insp pending special insp. report. 4/12/2001 8:57:13 AM
BLD-Framing/Rough-in4/4/20014/11/20014/11/2001APART
DetailsJim Storey
###-#### covered with special insp. heavy rain am. 4/11/2001 8:42:49 AM
BLD-Framing/Rough-in4/4/20014/9/20014/9/2001APART
DetailsJim Storey
###-#### work in progess pending special insp. report. 4/9/2001 9:46:03 AM
BLD-Framing/Rough-in4/4/20014/6/20014/6/2001APART
DetailsJim Storey
###-#### placed with special insp. pending report. 4/6/2001 9:23:36 AM
BLD-Framing/Rough-in4/4/20014/5/20014/5/2001APART
DetailsJim Storey
###-#### south panels rebar ok pending special insp. reports. 4/5/2001 8:17:47 AM
BLD-Concrete3/29/20013/29/20013/29/2001PPART
DetailsJim Storey
###-#### rebar on pannels ok need special insp. for concrete sampling. not on sit for n/w 3 pannels . 3/30/2001 8:45:33 AM
BLD-Footing3/21/20013/22/20013/22/2001PPART
DetailsJim Storey
###-#### placed with special insp.pending report. 3/22/2001 4:03:59 PM
BLD-Footing3/20/20013/20/20013/20/2001PPART
DetailsJim Storey
###-#### pendig scpope off wok from mti/allreports to date/engineers approvel of pluming ft conflick. 3/20/2001 4:15:46 PM