BLD-Final | 4/25/2001 | 4/25/2001 | 4/25/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/25/2001 at 06:48:00. Contact: ###-####. C/C issued. 4/25/2001 6:35:46 PM
|
BLD-Energy code compliance | 3/14/2001 | 3/15/2001 | 3/15/2001 | A | PASS |
Jim Sly
|
|
|
j p ###-####
|
BLD-Framing/Rough-in | 3/13/2001 | 3/14/2001 | 3/14/2001 | A | PASS |
Jim Sly
|
|
|
JP ###-####
|
BLD-Framing/Rough-in | 3/12/2001 | 3/12/2001 | 3/12/2001 | P | FAIL |
Tom Arcoraci
|
|
|
###-#### w 3/12/2001 3:51:07 PM
|
BLD-Footing | 2/14/2001 | 2/15/2001 | 2/15/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/14/2001 at 17:13:33. Contact: ###-####.
|
BLD-Footing | 2/14/2001 | 2/14/2001 | 2/14/2001 | A | PART |
Dave Hannah
|
|
|
Added by Inspector: 425 On 2/14/2001 10:47:22 AM
|
BLD-Footing | 2/13/2001 | 2/13/2001 | 2/13/2001 | P | FAIL |
Dave Hannah
|
|
|
###-#### front setback is to close only 19 ft 2/13/2001 3:29:13 PM
|