Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-00228
StatusFinaled
Name ST LUKES STL21506
Site Address 190 E BANNOCK ST
Project NameST LUKES-WEST WING
Customer Number21-506
ePlanReviewNo
Description
(ST LUKES-WEST WING-3RD FLOOR, NORTH END - PHASE 'A')(Outpatient/Offices) - To add new interior construction and finish to the north end area of the third floor, West Wing, demolished under BLD00-00081. Work to include installation of interior non-bearing, non-combustible walls; one hour fire-resistive sheetrock on framing; wall, floor & ceiling finishes; electrical, mechanical, plumbing, sprinkler & alarm system upgrades for code compliance and to meet needs of occupants. New finished area to be used as office's / treatment / procedure / out-patient exam / & reception - waiting rooms and provide two accessible compliant restrooms. This new area will be a stand alone suite with it's own exits. The existing 1-hour corridor system located at the south end of this remodel area SHALL be maintained at all times for exit purposes. An existing 2-hour shaft is being expanded to create new 2-hour mechanical shaft, to provide mechanical service to the West Wing from the mechanical room, ground floor, remodeled under BLD00-03449. The Structural Strengthening of the exterior walls, BLD00-02394, SHALL be completed and approved in the area of remodel before any new construction is begun. NOTE: This building is fully sprinklered. A "LETTER OF COMPLETION / COMPLIANCE" IS REQUIRED FOR THIS PROJECT AS A CONDITION OF THIS PERMIT. PC#01-083/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/1/20034/1/20034/1/2003PPASS
DetailsCarl Dependahl
KELLY; Phone #: ###-#### Internet Inspection Request from: Darla Downs...phase A OK FOR L/C, REC'D ENG'S AFFIDAVIT. OK FOR L/C AT THIS PHASE (c/o for entire area remodel) 4/1/2003 5:03:34 PM
BLD-Aging Inspection1/23/20031/23/20031/29/2003 PASS
DetailsCarl Dependahl
spoke w/ St Lukes...stilll awaiting eng's clarification/ok re seismic upgrade (original project)...new supt advised. 1/29/2003 9:20:44 AM
BLD-Conference1/29/20021/29/20021/29/2002PPASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 1/29/2002 2:16:08 PM w/ Stan & Wendell re c/n...keep c/n. complete all firestops, verify canopy modification approval 1/29/2002 6:16:20 PM
BLD-Conference12/17/200112/17/200112/17/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 12/17/2001 11:05:26 AM need eng's report for struct upgrade of entire portion of west wing.
BLD-Final12/6/200112/7/200112/7/2001AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/06/2001 at 12:02:46. Contact: ###-####. c/n re:affidavits, concrete testing may be invalid; seal firestop bulheads at rated walls, need new schedule for completion of project, verify 1hr around nurse station at cetral corr. 12/7/2001 12:26:01 PM
BLD-Final12/5/200112/6/200112/6/2001ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/05/2001 at 16:30:02. Contact: ###-####...need verify struct upgrade 12/6/2001 11:48:52 AM
BLD-Final12/6/200112/6/200112/6/2001PCANC
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 12/6/2001 11:49:19 AM ###-#### per cont. 12/6/2001 2:56:12 PM
FIRE-Final Inspection12/5/200112/5/200112/5/2001PPASS
DetailsRick Jackson
Added by Inspector: 409 On 12/5/2001 2:26:45 PM
BLD-Final12/3/200112/4/200112/4/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/03/2001 at 15:36:43. Contact: ###-####. ok for tranfer of occupants and corridor and double doors to be removed upon evacuation of b phase to complet exit sys.. 12/4/2001 1:53:07 PM
BLD-Framing/Rough-in11/29/200112/3/200112/3/2001PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/29/2001 at 16:37:26. Contact: ###-####. no live person on phone # to find insp. area. 12/3/2001 2:50:48 PM
FIRE-Final Inspection11/30/200112/3/200112/3/2001APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/30/2001 at 08:21:27. Contact: ###-####.
FIRE-Final Inspection11/29/200111/30/200111/30/2001ANR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/29/2001 at 16:36:54. Contact: ###-####.
BLD-Framing/Rough-in10/26/200110/26/200110/26/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/26/2001 11:30:15 AM 3rd fl treatment areas/ walls, pending other r/i's...add perimeter wires, spacers at grid.
BLD-Conference10/8/200110/8/200110/8/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/8/2001 10:41:44 AM w/supt...re insp requests, permit no's
BLD-Aging Inspection10/2/200110/2/200110/2/2001 NR
DetailsCarl Dependahl
wip for overall project 10/2/2001 2:52:36 PM
BLD-Conference10/2/200110/2/200110/2/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 10/2/2001 2:51:50 PM w/ Kelly, supt at site...permit #s may be confused...c/n issued w/bld00-02394
re framing, firestops, etc.
FIRE-Final Inspection8/1/20018/2/20018/2/2001ACANC
DetailsRick Jackson
Mike ###-#### wrong type of inspection; needed a sprinkler r/i inspection 8/2/2001 10:39:35 AM
FIRE-Sprinkler Rough-in8/2/20018/2/20018/2/2001APART
DetailsRick Jackson
Added by Inspector: 409 On 8/2/2001 10:38:52 AM north end okay to cover; air test held and will hydro under the other phase of project
BLD-Framing/Rough-in5/31/20016/1/20016/1/2001AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/31/2001 at 13:45:55. Contact: ###-####.c/n, firestop floors, verify hvac ok at smoke fire damper, post card, etc.. 6/1/2001 10:32:47 AM