BLD-Final | 6/8/2001 | 6/8/2001 | 6/8/2001 | P | PASS |
Tony Young
|
|
|
Shane ###-####
c of c issued 6/8/2001 2:55:55 PM
|
BLD-Framing/Rough-in | 4/27/2001 | 4/27/2001 | 4/27/2001 | P | PASS |
Tony Young
|
|
|
###-####
|
BLD-Framing/Rough-in | 4/25/2001 | 4/25/2001 | 4/25/2001 | P | PART |
Tony Young
|
|
|
###-####
c/n , ok to insulate, no mech. needed 4/25/2001 4:25:12 PM
|
BLD-Framing/Rough-in | 3/29/2001 | 3/30/2001 | 3/30/2001 | A | PASS |
Steven Webb
|
|
|
SHEAR-- SHAWN-- ###-####
|
BLD-Foundation | 3/27/2001 | 3/28/2001 | 3/28/2001 | A | PASS |
Tony Young
|
|
|
sean ###-####
not a foundation, just conf. on shear 3/28/2001 12:04:26 PM
|
BLD-Framing/Rough-in | 3/9/2001 | 3/12/2001 | 3/12/2001 | A | PART |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 3/9/2001 2:22:54 PM
pressure treat has been put in around window wells 3/12/2001 10:58:05 AM
|
BLD-Framing/Rough-in | 3/8/2001 | 3/9/2001 | 3/9/2001 | P | PART |
Tony Young
|
|
|
###-####
ok to cover main floor remodel, need to change out egress window frames to pressure treat down stairs,,, addition framing to come later 3/9/2001 2:22:31 PM
|
BLD-Footing | 3/7/2001 | 3/8/2001 | 3/8/2001 | A | PART |
Tony Young
|
|
|
###-####
post holes, ok w/ verbal corrections 3/8/2001 10:58:42 AM
|