BLD-Final | 6/11/2001 | 6/11/2001 | 6/11/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-#### lc issued 6/10/2001 9:24:41 PM
|
BLD-Energy code compliance | 4/13/2001 | 4/13/2001 | 4/13/2001 | P | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 4/13/2001 1:41:07 PM
|
BLD-Framing/Rough-in | 4/13/2001 | 4/13/2001 | 4/13/2001 | P | PASS |
Tom Arcoraci
|
|
|
george ###-#### fr insp
|
BLD-Framing/Rough-in | 4/11/2001 | 4/12/2001 | 4/12/2001 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 4/3/2001 | 4/3/2001 | 4/3/2001 | P | NR |
Russ Owen
|
|
|
fr ins-- ###-####- clive ,need to complete prior c/n hold down installations at front wall still posted on window, need to obtain fire place permit and inspection as posted on unit, left c/n posted do not cover recall. 4/3/2001 4:03:00 PM 4/3/2001 4:05:26 PM
|
BLD-Other | 3/30/2001 | 3/30/2001 | 3/30/2001 | A | PART |
Tom Arcoraci
|
|
|
Adjacent property owners concerned about drainage. Double check drainage control at final. 325
|
BLD-Foundation | 3/26/2001 | 3/26/2001 | 3/26/2001 | A | CANC |
Tom Arcoraci
|
|
|
Pat Nolan ###-####
|
BLD-Framing/Rough-in | 3/19/2001 | 3/19/2001 | 3/19/2001 | P | FAIL |
Tom Arcoraci
|
|
|
shear nailing-- pat-- ###-#### no plans 3/19/2001 3:29:36 PM
|
BLD-Foundation | 3/4/2001 | 3/5/2001 | 3/5/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/04/2001 at 19:43:58. Contact: ###-####.
|
BLD-Foundation | 3/1/2001 | 3/2/2001 | 3/2/2001 | A | NR |
Tom Arcoraci
|
|
|
no one at site no forms set
3/2/2001 10:51:45 AM
|
BLD-Footing | 3/1/2001 | 3/1/2001 | 3/1/2001 | P | PART |
Dave Hannah
|
|
|
###-####
|