BLD-Final | 1/10/2002 | 1/10/2002 | 1/10/2002 | P | FAIL |
Dave Hannah
|
|
|
###-#### c/n on site needs elec c/n finished and finaled 1/10/2002 3:30:49 PM
|
BLD-Aging Inspection | 12/24/2001 | 12/24/2001 | 12/24/2001 | | DONE |
Dave Hannah
|
|
|
W.I.P 12/24/2001 10:11:57 AM
|
BLD-Aging Inspection | 10/22/2001 | 10/22/2001 | 10/22/2001 | | PASS |
Dave Hannah
|
|
|
work in progress 10/22/2001 8:56:19 AM
|
BLD-Final | 8/14/2001 | 8/22/2001 | 8/22/2001 | P | NR |
Dave Hannah
|
|
|
###-####
|
BLD-Energy code compliance | 7/10/2001 | 7/12/2001 | 7/12/2001 | A | PASS |
Dave Hannah
|
|
|
scott ###-#### sheet rock crew will keep fireplace open so the fire wall and fire blocking can be inspected also fire blocking for chase backwall of furnace also up stairs fire wall at overbuild this is for all four units 7/13/2001 3:53:16 PM 7/13/2001 4:21:30 PM
|
BLD-Framing/Rough-in | 7/10/2001 | 7/11/2001 | 7/11/2001 | A | PASS |
Dave Hannah
|
|
|
scott ###-#### shear nailing ok all framing c/n item finished ok to inslate 7/11/2001 11:46:55 AM
|
BLD-Conference | 7/9/2001 | 7/9/2001 | 7/9/2001 | P | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 7/9/2001 3:35:13 PM
|
BLD-Framing/Rough-in | 7/6/2001 | 7/6/2001 | 7/6/2001 | P | FAIL |
Dave Hannah
|
|
|
FR TODD ###-#### c/n on site 7/6/2001 3:08:40 PM
|
BLD-Aging Inspection | 7/2/2001 | 7/2/2001 | 7/2/2001 | | PART |
Dave Hannah
|
|
|
work in progress 7/2/2001 3:59:08 PM
|
BLD-Footing | 5/1/2001 | 5/1/2001 | 5/1/2001 | P | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 5/1/2001 4:18:36 PM
|
BLD-Foundation | 3/29/2001 | 3/30/2001 | 3/30/2001 | A | PART |
Dave Hannah
|
|
|
Jed ###-#### W.I.P. 3/30/2001 9:09:20 AM
|
BLD-Footing | 3/28/2001 | 3/28/2001 | 3/28/2001 | P | PART |
Dave Hannah
|
|
|
Added by Inspector: 425 On 3/28/2001 2:13:12 PM W.I.P. 3/28/2001 2:14:22 PM
|