BLD-Final | 9/26/2001 | 9/26/2001 | 9/26/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/26/2001 at 07:28:17. Contact: . c. of c. #21601 issued. 9/26/2001 10:36:10 AM
|
BLD-Aging Inspection | 9/10/2001 | 9/10/2001 | 9/10/2001 | | PART |
Steven Webb
|
|
|
wip 9/10/2001 8:57:21 AM
|
BLD-Framing/Rough-in | 7/6/2001 | 7/9/2001 | 7/9/2001 | A | PASS |
Steven Webb
|
|
|
Framing - reinspect - Joe, ###-#### ok to cover--energy report was submitted. 7/9/2001 9:01:07 AM
|
BLD-Framing/Rough-in | 7/5/2001 | 7/6/2001 | 7/6/2001 | A | FAIL |
Steven Webb
|
|
|
Joe, ###-#### c/n electrical final needed--verify c/n items completed. 7/6/2001 11:46:05 AM
|
BLD-Wall cover | 7/3/2001 | 7/5/2001 | 7/5/2001 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 07/03/2001 at 13:40:05. Contact: . Vapor barrier not completed 7/5/2001 8:27:27 AM
|
BLD-Framing/Rough-in | 7/2/2001 | 7/2/2001 | 7/2/2001 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/02/2001 at 09:34:55. Contact: .c/n 7/2/2001 3:43:59 PM
|
BLD-Framing/Rough-in | 5/30/2001 | 5/31/2001 | 5/31/2001 | A | NR |
Dave Hannah
|
|
|
terry ###-#### crew is still working on stapeling panels 5/31/2001 9:34:14 AM
|
BLD-Framing/Rough-in | 5/31/2001 | 5/31/2001 | 5/31/2001 | P | PART |
Dave Hannah
|
|
|
shear nail Terry ###-#### shear nailing ext panels ok to cover 5/31/2001 2:41:41 PM
|
BLD-Foundation | 4/30/2001 | 5/1/2001 | 5/1/2001 | A | PART |
Steven Webb
|
|
|
wall insp Michael ###-#### wip 5/1/2001 3:17:48 PM
|
BLD-Footing | 4/30/2001 | 4/30/2001 | 4/30/2001 | P | NR |
Carl Dependahl
|
|
|
ft insp michael ###-####...sent to 420 4/30/2001 2:15:07 PM
|
BLD-Footing | 4/30/2001 | 4/30/2001 | 4/30/2001 | P | PART |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 4/30/2001 12:16:51 PM wip--20' setback from rear of sidewalk to foundational wall needs to be verified at wall inspection. 4/30/2001 12:37:13 PM
|