Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-00365
StatusFinaled
Name BRIGHTON CORPORATION
Site Address 4078 S BARBER STATION WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 1657 sq. ft. one story single family dwelling with a 504 sq. ft. attached two car garage, a 90 sq. ft. covered entry porch and a 155 sq. ft. covered concrete patio per approved plans and attached requirement lists. PC #099 DJO CUP #98-0116
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in8/20/20018/20/20018/20/2001PPART
DetailsJim Storey
Added by Inspector: 301 On 8/20/2001 2:36:02 PM fire stop ok to insulate
BLD-Final7/13/20017/13/20017/13/2001PPASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 07/13/2001 at 11:02:33. Contact: . C. of C. #20456 issued 7/13/2001 3:10:13 PM
BLD-Wall cover5/11/20015/14/20015/14/2001APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 05/11/2001 at 11:10:00. Contact: .
BLD-Framing/Rough-in5/10/20015/11/20015/11/2001APART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 05/10/2001 at 14:32:41. Contact: . C/N issued--ok to insulate. 5/11/2001 8:59:55 AM
BLD-Framing/Rough-in5/9/20015/10/20015/10/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 05/09/2001 at 16:31:45. Contact: .need stamped set of truss engineering, ok to insulate 5/10/2001 10:56:10 AM
BLD-Framing/Rough-in5/8/20015/8/20015/8/2001PNR
DetailsSteven Webb
Scheduled by a contractor via Hello! on 05/08/2001 at 09:58:14. Contact: . C/N posted- 5/8/2001 1:54:14 PM
BLD-Other4/27/20014/30/20014/30/2001APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 04/27/2001 at 15:42:32. Contact: . SHEAR--ok to side. 4/30/2001 8:47:46 AM
BLD-Other4/26/20014/27/20014/27/2001PFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 04/26/2001 at 16:21:54. Contact: . C/N posted--nailing not per plans. SHEAR- 4/27/2001 3:31:16 PM
BLD-Foundation3/28/20013/29/20013/29/2001APART
DetailsSteven Webb
michael ###-#### ready at 9 wip 3/29/2001 9:35:52 AM
BLD-Footing3/27/20013/27/20013/27/2001PPASS
DetailsSteven Webb
Randy ###-####