BLD-Final | 5/24/2001 | 5/24/2001 | 5/24/2001 | P | PASS |
Steven Webb
|
|
|
pat ###-#### C. of C. #21425 issued. 5/24/2001 2:05:57 PM
|
BLD-Energy code compliance | 4/10/2001 | 4/10/2001 | 4/10/2001 | P | PASS |
Tom Arcoraci
|
|
|
-###-#### STEVE ENERGY CODE
|
BLD-Framing/Rough-in | 4/10/2001 | 4/10/2001 | 4/10/2001 | P | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 4/10/2001 1:19:28 PM
|
BLD-Framing/Rough-in | 4/3/2001 | 4/4/2001 | 4/4/2001 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/03/2001 at 14:43:19. Contact: ###-####.ok to insulate--c/n issued-will verify at energy. 4/4/2001 12:01:21 PM
|
BLD-Framing/Rough-in | 3/30/2001 | 3/30/2001 | 3/30/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/30/2001 at 10:51:17. Contact: ###-####.Prior c/n items corrected--SHEAR 3/30/2001 12:40:55 PM
|
BLD-Framing/Rough-in | 3/27/2001 | 3/27/2001 | 3/27/2001 | P | PART |
Steven Webb
|
|
|
###-####Shear--C/N posted-garage front hd are not per plan, back side of garage needs OSB --Ok to side except garage front. 3/27/2001 3:19:19 PM
|
BLD-Foundation | 3/6/2001 | 3/6/2001 | 3/6/2001 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/06/2001 at 07:53:08. Contact: ###-####.
|
BLD-Foundation | 3/2/2001 | 3/5/2001 | 3/5/2001 | A | CANC |
Steven Webb
|
|
|
Disp set to [CANC] by a contractor via Hello! on 03/05/2001 at 06:54:47.
|
BLD-Foundation | 3/2/2001 | 3/2/2001 | 3/2/2001 | A | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/02/2001 at 06:53:13. Contact: ###-####. Cancelled by contractor. 3/2/2001 8:23:31 AM
|
BLD-Footing | 3/1/2001 | 3/1/2001 | 3/1/2001 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/01/2001 at 10:37:16. Contact: ###-####.
|