BLD-Final | 4/17/2001 | 4/18/2001 | 4/18/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/17/2001 at 17:22:20. Contact: ###-####. C/C issued. 4/18/2001 3:04:48 PM
|
BLD-Final | 4/17/2001 | 4/17/2001 | 4/17/2001 | P | FAIL |
Dave Hannah
|
|
|
###-#### c/n on site 4/17/2001 2:34:27 PM
|
BLD-Energy code compliance | 3/16/2001 | 3/19/2001 | 3/19/2001 | A | PASS |
Jim Sly
|
|
|
jp ###-####
|
BLD-Framing/Rough-in | 3/16/2001 | 3/19/2001 | 3/19/2001 | A | PASS |
Jim Sly
|
|
|
JP ###-#### reinspection
|
BLD-Framing/Rough-in | 3/14/2001 | 3/15/2001 | 3/15/2001 | P | FAIL |
Jim Sly
|
|
|
JP ###-#### C/N misc corr. 3/15/2001 1:41:22 PM
|
BLD-Framing/Rough-in | 3/15/2001 | 3/15/2001 | 3/15/2001 | P | PART |
Jim Sly
|
|
|
###-#### Shear OK. 3/15/2001 1:40:32 PM
|
BLD-Framing/Rough-in | 3/12/2001 | 3/12/2001 | 3/12/2001 | P | FAIL |
Jim Sly
|
|
|
SHEAR ###-#### Nail shear panel N. Gar front. 3/12/2001 2:49:34 PM
|
BLD-Foundation | 2/27/2001 | 2/28/2001 | 2/28/2001 | A | PART |
Tom Arcoraci
|
|
|
###-#### incomplete 2/28/2001 11:21:59 AM
|
BLD-Footing | 2/27/2001 | 2/27/2001 | 2/27/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 02/27/2001 at 04:44:39. Contact: ###-####.
|