BLD-Final | 6/8/2001 | 6/11/2001 | 6/11/2001 | A | PASS |
Tom Arcoraci
|
|
|
fn occ-- call 1st before-insp ---- bob ###-#### ok for perm occ 6/10/2001 8:27:26 PM
|
Permanent Occupancy | | 6/11/2001 | 6/11/2001 | | DONE |
|
|
|
|
BLD-Final | 5/14/2001 | 5/14/2001 | 5/14/2001 | P | PART |
Russ Owen
|
|
|
bob ###-#### ok temp oc needs safety glass at new door,lower toilet paper 1-1/2 under grab rails rest rooms. 12/14/2001 3:38:44 PM
|
FIRE-Final Inspection | 5/14/2001 | 5/14/2001 | 5/14/2001 | P | PASS |
Joe Tawney
|
|
|
Reinsp OK for permanant occupancy 5/14/2001 1:18:25 PM
|
BLD-Final | 5/10/2001 | 5/11/2001 | 5/11/2001 | P | NR |
Russ Owen
|
|
|
###-#### needs fire /life safety before calling for final. 12/11/2001 1:04:11 PM
|
FIRE-Final Inspection | 5/10/2001 | 5/11/2001 | 5/11/2001 | A | FAIL |
Joe Tawney
|
|
|
bob ###-#### Final Fail Several duct det improperly installed 5/11/2001 11:24:17 AM
|
FIRE-Final Inspection | 5/7/2001 | 5/8/2001 | 5/8/2001 | P | NR |
Joe Tawney
|
|
|
bob ###-#### Not ready . Work not completed. 5/8/2001 2:59:30 PM
|
BLD-Other | 5/1/2001 | 5/2/2001 | 5/2/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 08:24:47. Contact: ###-####. ceiling grid. req 1 pod in left side needed. 12/2/2001 10:38:54 AM
|
FIRE-Final Inspection | 5/1/2001 | 5/2/2001 | 5/2/2001 | A | PART |
Joe Tawney
|
|
|
###-#### OK on spklr rough in 5/2/2001 10:29:13 AM
|
BLD-Framing/Rough-in | 4/9/2001 | 4/10/2001 | 4/10/2001 | A | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/09/2001 at 16:44:58. Contact: ###-####. Contr called in wrong job. 4/10/2001 10:49:22 AM
|
BLD-Framing/Rough-in | 3/29/2001 | 3/30/2001 | 3/30/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/29/2001 at 14:54:46. Contact: ###-####.ok to sheetrock 3/30/2001 4:50:13 PM
|