BLD-Final | 7/19/2001 | 7/20/2001 | 7/20/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by Inspector: 425 On 7/19/2001 5:12:20 PM c.c #20372 issued 7/20/2001 10:09:15 AM
|
BLD-Final | 7/19/2001 | 7/19/2001 | 7/19/2001 | P | FAIL |
Dave Hannah
|
|
|
call first ###-#### late pm c/n on site hand rail for stairs going up 7/19/2001 5:15:48 PM
|
BLD-Energy code compliance | 5/30/2001 | 5/31/2001 | 5/31/2001 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 5/24/2001 | 5/25/2001 | 5/25/2001 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/24/2001 at 11:50:07. Contact: ###-####. Complete prev corr...... 5/25/2001 9:05:56 AM
|
BLD-Framing/Rough-in | 5/25/2001 | 5/25/2001 | 5/25/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/25/2001 at 10:07:40. Contact: ###-####. C/N posted. 5/25/2001 2:05:10 PM
|
BLD-Energy code compliance | 5/23/2001 | 5/23/2001 | 5/23/2001 | P | NR |
Dave Hannah
|
|
|
Burt ###-####
|
BLD-Framing/Rough-in | 4/23/2001 | 4/23/2001 | 4/23/2001 | P | PART |
Jim Sly
|
|
|
###-####//SHEAR WALL Shear wall OK. 4/23/2001 8:28:11 PM
|
BLD-Framing/Rough-in | 4/18/2001 | 4/18/2001 | 4/18/2001 | P | FAIL |
Russ Owen
|
|
|
shear wall ###-#### nail directley above hds. told contractor to recall. 11/18/2001 2:27:54 PM
|
BLD-Foundation | 3/13/2001 | 3/13/2001 | 3/13/2001 | P | PASS |
Jim Sly
|
|
|
|
BLD-Footing | 3/12/2001 | 3/12/2001 | 3/12/2001 | P | PART |
Tom Arcoraci
|
|
|
###-####
|