BLD-Final | 5/15/2001 | 5/16/2001 | 5/16/2001 | A | PASS |
Dave Hannah
|
|
|
Gary ###-####
|
BLD-Final | 5/15/2001 | 5/15/2001 | 5/15/2001 | P | FAIL |
Steven Webb
|
|
|
GARY ###-#### C/N posted on site. 5/15/2001 2:40:57 PM
|
BLD-Energy code compliance | 4/11/2001 | 4/11/2001 | 4/11/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 4/11/2001 10:31:20 AM Prior c/n item corrected. 4/11/2001 10:31:40 AM
|
BLD-Energy code compliance | 4/9/2001 | 4/10/2001 | 4/10/2001 | P | FAIL |
Tom Arcoraci
|
|
|
gary ###-#### needs fire place inspection 4/10/2001 1:38:15 PM
|
BLD-Framing/Rough-in | 4/6/2001 | 4/6/2001 | 4/6/2001 | P | PART |
Steven Webb
|
|
|
FR GARY-- ###-#### C/N issued-ok to insulate. 4/6/2001 3:39:47 PM
|
BLD-Framing/Rough-in | 3/30/2001 | 4/2/2001 | 4/2/2001 | A | PASS |
Steven Webb
|
|
|
shear panel ###-#### Shear -- ok to side. 4/2/2001 4:13:54 PM
|
BLD-Wall cover | 3/29/2001 | 3/30/2001 | 3/30/2001 | P | FAIL |
Steven Webb
|
|
|
###-#### shear C/N posted--additional fastening of shear panels required per approved plans--inspector marked with black crayon.--Do not side. 3/30/2001 3:52:00 PM
|
BLD-Foundation | 3/14/2001 | 3/14/2001 | 3/14/2001 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/14/2001 at 07:28:41. Contact: ###-####. wip-appears ok-hd not installed at time of inspection. 3/14/2001 10:54:22 AM
|
BLD-Footing | 3/13/2001 | 3/13/2001 | 3/13/2001 | P | PART |
Dave Hannah
|
|
|
FT ERIC ###-#### 3/13/2001 1:36:31 PM crew still placing formes 3/13/2001 1:37:01 PM
|