BLD-Final | 11/15/2001 | 11/16/2001 | 11/16/2001 | A | PASS |
Jim Storey
|
|
|
travis-- ###-#### fn occ final ok 11/16/2001 9:52:25 AM
|
BLD-Final | 11/14/2001 | 11/15/2001 | 11/15/2001 | A | FAIL |
Jim Storey
|
|
|
###-####
|
BLD-Final | 11/15/2001 | 11/15/2001 | 11/15/2001 | P | FAIL |
Jim Storey
|
|
|
###-#### mech c/n and hand railling to high. 11/15/2001 3:37:16 PM
|
BLD-Final | 11/14/2001 | 11/14/2001 | 11/14/2001 | P | CANC |
Jim Storey
|
|
|
###-#### called and cancled mech failled. 11/14/2001 12:17:51 PM
|
BLD-Energy code compliance | 8/30/2001 | 8/31/2001 | 8/31/2001 | A | PASS |
Tom Arcoraci
|
|
|
###-#### travis
|
BLD-Framing/Rough-in | 8/28/2001 | 8/29/2001 | 8/29/2001 | P | PASS |
Jim Storey
|
|
|
###-#### SUSAN mech fail. area not concealed ok to insulate.8/29/2001 4:16:53 PM 8/29/2001 4:45:04 PM
|
BLD-Framing/Rough-in | 8/27/2001 | 8/28/2001 | 8/28/2001 | A | FAIL |
Steven Webb
|
|
|
###-#### TRAVIS C/N posted on site-- 8/28/2001 9:27:58 AM
|
BLD-Framing/Rough-in | 8/23/2001 | 8/24/2001 | 8/24/2001 | P | CANC |
Jim Storey
|
|
|
scott ###-####
|
BLD-Framing/Rough-in | 8/16/2001 | 8/17/2001 | 8/17/2001 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/16/2001 at 16:33:18. Contact: ###-####. needs all roough ins completed 8/17/2001 2:25:43 AM
|
BLD-Conference | 8/6/2001 | 8/6/2001 | 8/6/2001 | P | PART |
Bob Archibald
|
|
|
ok to work on main structure no work allowed on 3rd garage
|
BLD-Conference | 7/10/2001 | 7/11/2001 | 7/11/2001 | A | FAIL |
Steven Webb
|
|
|
call scott ###-#### per david hannah when you go down to the job site and he will meet you out there. C/N --Remove siding at garage front and sw corner of dining to review hd straps and nailing, Contractor added single garage from approved plans called for resubmittal to plan review. Put hold on inspection. 7/11/2001 11:42:08 AM
|
BLD-Framing/Rough-in | 7/9/2001 | 7/10/2001 | 7/10/2001 | A | FAIL |
Dave Hannah
|
|
|
###-#### 7/10/2001 9:24:48 AM no city approved plans on site on mec rough in house has been sided with out a shear inspection 7/10/2001 10:03:25 AM
|
BLD-Footing | 6/8/2001 | 6/8/2001 | 6/8/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 06/08/2001 at 06:47:56. Contact: ###-####.
already pouring, verbal corrections on roots on the rest 6/8/2001 11:34:55 AM
|
BLD-Foundation | 6/8/2001 | 6/8/2001 | 6/8/2001 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/08/2001 at 06:48:55. Contact: ###-####. hold downs not required change approved by 301 double doors gone. 6/8/2001 2:01:42 PM
|
BLD-Footing | 6/7/2001 | 6/7/2001 | 6/7/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### travis ft
|
BLD-Footing | 6/7/2001 | 6/7/2001 | 6/7/2001 | P | NR |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 6/7/2001 2:44:10 PM
|