BLD-Final | 8/7/2001 | 8/7/2001 | 8/7/2001 | P | PASS |
Tony Young
|
|
|
TODD- ###-#### FN
|
BLD-Conference | 6/8/2001 | 6/8/2001 | 6/8/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/8/2001 9:34:27 AM w/ bldr, keep c/n, recall when ready
|
BLD-Conference | 6/8/2001 | 6/8/2001 | 6/8/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/8/2001 9:00:21 AM w/ contractor re c/n...keep c/n
|
BLD-Energy code compliance | 6/8/2001 | 6/8/2001 | 6/8/2001 | P | PART |
Carl Dependahl
|
|
|
please call before going out so the guy can meet you out there with the plans ###-####; ok exc. at f.p. 6/8/2001 6:00:10 PM
|
BLD-Energy code compliance | 6/6/2001 | 6/7/2001 | 6/7/2001 | A | FAIL |
Carl Dependahl
|
|
|
###-####; c/n issued: firestops, gypsum backing, nailing 6/7/2001 9:39:43 AM 6/7/2001 9:41:11 AM
|
BLD-Energy code compliance | 6/5/2001 | 6/6/2001 | 6/6/2001 | P | NR |
Dave Hannah
|
|
|
###-#### Todd framing c/n items have been completed 6/6/2001 4:00:42 PM
|
BLD-Framing/Rough-in | 6/5/2001 | 6/5/2001 | 6/5/2001 | P | PART |
Dave Hannah
|
|
|
###-#### c/n on site from 6/4 still need to correct several items ok to insulate 6/5/2001 3:42:57 PM
|
BLD-Framing/Rough-in | 6/1/2001 | 6/4/2001 | 6/4/2001 | P | FAIL |
Carl Dependahl
|
|
|
6/1/2001 3:41:04 PM, complete air seal, 1hr wall, f.p. do not insul. 6/4/2001 6:33:54 PM
|
BLD-Framing/Rough-in | 6/1/2001 | 6/1/2001 | 6/1/2001 | P | CANC |
Tony Young
|
|
|
Todd ###-####
|
BLD-Conference | 5/21/2001 | 5/22/2001 | 5/22/2001 | A | PASS |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 5/21/2001 1:54:49 PM
|
BLD-Framing/Rough-in | 5/21/2001 | 5/21/2001 | 5/21/2001 | P | PART |
Tony Young
|
|
|
todd ###-#### shear wall
ext. shear ok 5/21/2001 1:52:18 PM
|
BLD-Framing/Rough-in | 5/11/2001 | 5/11/2001 | 5/11/2001 | P | PART |
Tony Young
|
|
|
###-####
int. party/ fire wall ok to stand, wall and attic truss, some verbal corrections 5/11/2001 2:54:42 PM
|
BLD-Foundation | 4/24/2001 | 4/24/2001 | 4/24/2001 | P | PART |
Tony Young
|
|
|
###-####
wip, ok so far 4/24/2001 9:50:14 PM
|
BLD-Foundation | 4/23/2001 | 4/23/2001 | 4/23/2001 | P | PART |
Tony Young
|
|
|
###-####
ftg inspection ok, wip 4/23/2001 4:23:27 PM
|