BLD-Final | 7/9/2001 | 7/9/2001 | 7/9/2001 | P | PASS |
Jim Sly
|
|
|
###-#### C/C issued 7/9/2001 3:11:31 PM
|
BLD-Energy code compliance | 5/22/2001 | 5/23/2001 | 5/23/2001 | A | PASS |
Jim Sly
|
|
|
john ###-####
|
BLD-Framing/Rough-in | 5/22/2001 | 5/23/2001 | 5/23/2001 | A | PASS |
Jim Sly
|
|
|
john ###-####
|
BLD-Framing/Rough-in | 5/21/2001 | 5/22/2001 | 5/22/2001 | A | FAIL |
Jim Sly
|
|
|
###-#### C/N (dave Hannah) left on site. 5/22/2001 12:55:23 PM
|
BLD-Framing/Rough-in | 5/10/2001 | 5/11/2001 | 5/11/2001 | A | PART |
Jim Sly
|
|
|
shear wall John ###-#### Shear OK. 5/11/2001 9:07:22 AM
|
BLD-Foundation | 4/3/2001 | 4/4/2001 | 4/4/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/03/2001 at 16:15:31. Contact: ###-####.
|
BLD-Footing | 4/3/2001 | 4/3/2001 | 4/3/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/03/2001 at 10:05:00. Contact: ###-####.
|
BLD-Footing | 4/2/2001 | 4/2/2001 | 4/2/2001 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/02/2001 at 09:55:27. Contact: ###-####. Still Excavating. 4/2/2001 5:35:47 PM
|