BLD-Final | 3/28/2001 | 3/28/2001 | 3/28/2001 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/28/2001 at 07:34:26. Contact: ###-####. l/c on site 3/28/2001 5:08:49 PM
|
BLD-Framing/Rough-in | 3/15/2001 | 3/16/2001 | 3/16/2001 | A | PASS |
Jim Storey
|
|
|
880-*4125 under floor framing ok. 3/16/2001 9:36:06 AM
|
BLD-Framing/Rough-in | 3/15/2001 | 3/15/2001 | 3/15/2001 | P | FAIL |
Russ Owen
|
|
|
###-####past canal of vista. 3/15/2001 1:13:07 PMneed to install the rafter struts @45 back to bearing wall as shown on plans,need to cover for poss rain will leave one sheet loose for inspection. 3/15/2001 2:23:32 PM
|