BLD-Final | 6/1/2001 | 6/1/2001 | 6/1/2001 | P | PASS |
Jim Sly
|
|
|
###-#### lock door behind you C/C issued. 6/1/2001 2:54:37 PM
|
BLD-Energy code compliance | 4/17/2001 | 4/18/2001 | 4/18/2001 | A | PASS |
Jim Sly
|
|
|
reinspection ###-####
|
BLD-Framing/Rough-in | 4/17/2001 | 4/18/2001 | 4/18/2001 | A | PASS |
Jim Sly
|
|
|
Chuck ###-#### reinspection
|
BLD-Energy code compliance | 4/17/2001 | 4/17/2001 | 4/17/2001 | P | FAIL |
Dave Hannah
|
|
|
###-#### 4/17/2001 1:42:16 PM c/n items not completed 4/17/2001 1:42:41 PM
|
BLD-Framing/Rough-in | 4/13/2001 | 4/16/2001 | 4/16/2001 | A | FAIL |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 4/16/2001 | 4/16/2001 | 4/16/2001 | P | FAIL |
Jim Sly
|
|
|
###-#### C/N issued. 4/16/2001 6:57:08 PM
|
BLD-Framing/Rough-in | 4/12/2001 | 4/13/2001 | 4/13/2001 | A | FAIL |
Russ Owen
|
|
|
shear ###-#### chuckc/n posted 4/13/2001 10:19:34 AM
|
BLD-Foundation | 3/27/2001 | 3/27/2001 | 3/27/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/27/2001 at 05:59:28. Contact: ###-####.
|
BLD-Footing | 3/26/2001 | 3/26/2001 | 3/26/2001 | P | PART |
Jim Sly
|
|
|
Rob ###-####
|