BLD-Final | 5/30/2002 | 5/31/2002 | 5/31/2002 | A | DONE |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/30/2002 at 09:16:45. Contact: ###-####.
|
BLD-Final | 5/30/2002 | 5/30/2002 | 5/30/2002 | P | PASS |
Jim Storey
|
|
|
###-#### final ok 5/30/2002 3:41:56 PM
|
Code Occupancy Approval | 5/30/2002 | 5/30/2002 | 5/30/2002 | P | PASS |
Wm. Michael Meloy
|
|
|
|
Permanent Occupancy | | 5/30/2002 | 5/30/2002 | | DONE |
|
|
|
|
FIRE-Final Inspection | 5/15/2002 | 5/15/2002 | 5/16/2002 | P | FAIL |
Rick Jackson
|
|
|
BUILDING #26 ###-#### FRANK alarms not working; not sending signals to main panel 5/16/2002 3:14:48 PM
|
BLD-Wall cover | 2/6/2002 | 2/6/2002 | 2/6/2002 | A | PASS |
Jim Storey
|
|
|
Added by Inspector: 301 On 2/6/2002 10:13:09 AM ceilling patch ok 1 st floor/ ok for cover all bldg.
|
BLD-Energy code compliance | 1/31/2002 | 2/1/2002 | 2/1/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/31/2002 at 10:52:42. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/29/2002 | 1/30/2002 | 1/30/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/29/2002 at 13:47:18. Contact: ###-####.
|
BLD-Aging Inspection | 10/29/2001 | 10/29/2001 | 10/29/2001 | | PASS |
Jim Storey
|
|
|
wip 11/5/2001 7:11:17 AM
|
BLD-Concrete | 8/27/2001 | 8/28/2001 | 8/28/2001 | A | DONE |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/27/2001 at 08:01:08. Contact: ###-####. already poured--special inspection 8/28/2001 11:16:13 AM
|
BLD-Foundation | 8/10/2001 | 8/13/2001 | 8/13/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/10/2001 at 09:15:24. Contact: ###-####. placed with special insp. daily log all reports ok. 8/13/2001 9:08:49 AM
|
BLD-Footing | 7/31/2001 | 8/1/2001 | 8/1/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/31/2001 at 08:59:08. Contact: ###-####. placed with special insp. 8/1/2001 7:56:00 AM
|