BLD-Final | 5/15/2001 | 5/15/2001 | 5/15/2001 | P | PASS |
Jim Sly
|
|
|
Chuck ###-#### C/C issued. 5/15/2001 1:43:59 PM
|
BLD-Energy code compliance | 4/19/2001 | 4/19/2001 | 4/19/2001 | P | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 4/17/2001 | 4/18/2001 | 4/18/2001 | A | FAIL |
Jim Sly
|
|
|
Chuck ###-#### C/N posted. 4/18/2001 2:52:22 PM
|
BLD-Framing/Rough-in | 4/17/2001 | 4/17/2001 | 4/17/2001 | P | PASS |
Dave Hannah
|
|
|
SHEAR NAIL\\###-####
|
BLD-Framing/Rough-in | 4/12/2001 | 4/13/2001 | 4/13/2001 | A | PART |
Jim Sly
|
|
|
shear ###-#### Shear OK. 4/13/2001 3:17:30 PM
|
BLD-Foundation | 3/27/2001 | 3/27/2001 | 3/27/2001 | A | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 03/27/2001 at 06:00:49. Contact: ###-####.
|
BLD-Footing | 3/26/2001 | 3/26/2001 | 3/26/2001 | A | PART |
Jim Sly
|
|
|
###-#### Rob
|