BLD-Aging Inspection | 12/31/2001 | 12/31/2001 | 12/31/2001 | | PASS |
Tom Arcoraci
|
|
|
ok for perm occ 1/3/2002 9:13:06 AM
|
BLD-Final | 10/26/2001 | 10/29/2001 | 10/29/2001 | A | PASS |
Tom Arcoraci
|
|
|
###-#### GREGG ok for perm occ 10/29/2001 12:07:49 PM
|
Permanent Occupancy | | 10/29/2001 | 10/29/2001 | | DONE |
|
|
|
|
BLD-Final | 9/24/2001 | 9/25/2001 | 9/25/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/24/2001 at 14:44:12. Contact: .needs schell finaled see permit 01-00107. also door hardware at the rear door. to hallway. ok temporary oc only. 9/25/2001 12:50:40 PM 9/25/2001 12:51:09 PM
|
FIRE-Final Inspection | 9/24/2001 | 9/24/2001 | 9/24/2001 | P | PASS |
Rick Jackson
|
|
|
###-#### greg
|
BLD-Other | 9/12/2001 | 9/13/2001 | 9/13/2001 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/12/2001 at 17:08:06. Contact: ###-####. needs fire life safty sing off 9/13/2001 1:18:30 PM
|
BLD-Final | 9/12/2001 | 9/12/2001 | 9/12/2001 | P | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/12/2001 at 08:36:29. Contact: ###-####.
|
FIRE-Final Inspection | 9/12/2001 | 9/12/2001 | 9/12/2001 | P | NR |
Joe Tawney
|
|
|
Final cancel not ready to be reshed 9/12/2001 1:27:10 PM
|
BLD-Other | 8/14/2001 | 8/15/2001 | 8/15/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/14/2001 at 20:34:49. Contact: ###-####. needs arch detail for wall connection no detail on plan 8/14/2001 10:15:31 PM
|
BLD-Framing/Rough-in | 7/27/2001 | 7/30/2001 | 7/30/2001 | A | PART |
Tom Arcoraci
|
|
|
grid ceiling Aaron ###-#### grid ok 7/29/2001 10:40:57 PM
|