BLD-Final | 5/18/2001 | 5/18/2001 | 5/18/2001 | P | PASS |
Dave Hannah
|
|
|
fn- scott ###-####
|
FIRE-Final Inspection | 5/18/2001 | 5/18/2001 | 5/18/2001 | P | PASS |
Joe Tawney
|
|
|
###-#### reinspection REinsp OK for permanant occupancy 5/18/2001 2:20:59 PM
|
FIRE-Final Inspection | 5/14/2001 | 5/15/2001 | 5/15/2001 | A | FAIL |
Joe Tawney
|
|
|
###-#### fINAL fAIL fIRE eXT AND FRONT DOOR LANDING 5/15/2001 11:22:24 AM
|
Permanent Occupancy | | 5/15/2001 | 5/15/2001 | | DONE |
|
|
|
|
BLD-Final | 5/14/2001 | 5/14/2001 | 5/14/2001 | P | FAIL |
Dave Hannah
|
|
|
fn --scott ###-#### need fire life saftey and zoning 5/14/2001 4:01:24 PM
|
BLD-Final | 4/27/2001 | 5/2/2001 | 5/2/2001 | P | CANC |
Dave Hannah
|
|
|
fn ---scott ###-####--cancel per scott for fn
|