BLD-Final | 1/2/2002 | 1/2/2002 | 1/2/2002 | P | PASS |
Russ Owen
|
|
|
MARK ###-#### OK for per 1/2/2002 5:44:58 PM manent oc all required signatures have signed perm. 1/2/2002 5:45:25 PM
|
BLD-Final | 12/27/2001 | 12/27/2001 | 12/27/2001 | P | PART |
Russ Owen
|
|
|
###-####c/n posted. 12/27/2001 1:15:08 PM
|
FIRE-Final Inspection | 12/27/2001 | 12/27/2001 | 12/27/2001 | A | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 12/27/2001 8:44:24 AM Fire life/safety finaled
|
FIRE-Final Inspection | 10/24/2001 | 10/24/2001 | 10/24/2001 | P | NR |
Troy Cobbley
|
|
|
Not ready for life/safety final 10/24/2001 2:12:05 PM
|
BLD-Final | 8/27/2001 | 8/27/2001 | 8/27/2001 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/27/2001 at 10:07:37. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/17/2001 | 8/20/2001 | 8/20/2001 | A | PART |
Russ Owen
|
|
|
frank ###-####. new garage ok, needs all reqd signatures for a final inspection for a temp oc. . other work at ext shop not yet ready.8/20/2001 9:55:46 AM 8/20/2001 9:56:15 AM
|
BLD-Other | 8/1/2001 | 8/2/2001 | 8/2/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/01/2001 at 14:50:41. Contact: ###-####.
|
BLD-Concrete | 7/31/2001 | 8/1/2001 | 8/1/2001 | A | PART |
Russ Owen
|
|
|
###-####.3rd lift ok. 8/1/2001 10:26:29 AM
|
BLD-Concrete | 7/27/2001 | 7/30/2001 | 7/30/2001 | A | PART |
Russ Owen
|
|
|
###-#### block insp.ok 1st pour no s-i required. 7/30/2001 9:17:16 AM
|
BLD-Foundation | 7/30/2001 | 7/30/2001 | 7/30/2001 | P | PART |
Russ Owen
|
|
|
###-#### late pm 2nd lift pour. 7/30/2001 4:45:50 PM
|
BLD-Footing | 7/11/2001 | 7/11/2001 | 7/11/2001 | P | PART |
Russ Owen
|
|
|
late pm Frank ###-#### rear area only . 7/11/2001 4:27:01 PM
|