BLD-Final | 11/14/2001 | 11/15/2001 | 11/15/2001 | P | PASS |
Tony Young
|
|
|
###-#### JOHN
ok for perm. if others are 11/15/2001 5:26:51 PM
|
BLD-Final | 11/6/2001 | 11/7/2001 | 11/7/2001 | P | PART |
Russ Owen
|
|
|
###-#### JOHNneeds s-i report and all signatures on card. ok temp oc. 11/7/2001 1:18:39 PM
|
FIRE-Final Inspection | 11/7/2001 | 11/7/2001 | 11/7/2001 | A | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 11/7/2001 9:39:58 AM Fire sprinkler system finaled.
|
FIRE-Final Inspection | 11/7/2001 | 11/7/2001 | 11/7/2001 | A | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 11/7/2001 9:40:45 AM Fire/life safety finaled
|
FIRE-Final Inspection | 11/6/2001 | 11/7/2001 | 11/7/2001 | A | DONE |
Troy Cobbley
|
|
|
duplicate inspection 11/7/2001 9:48:07 AM
|
BLD-Final | 10/31/2001 | 11/1/2001 | 11/1/2001 | A | NR |
Tony Young
|
|
|
need trades signed off, ok to stock shelves, NO PUBLIC, working on punch list 11/1/2001 2:47:53 PM
|
BLD-Final | 10/30/2001 | 10/31/2001 | 10/31/2001 | P | NR |
Tony Young
|
|
|
###-####
|
FIRE-Final Inspection | 10/30/2001 | 10/31/2001 | 10/31/2001 | P | CANC |
Troy Cobbley
|
|
|
phone lines not in 10/31/2001 2:54:09 PM
|
BLD-Conference | 10/2/2001 | 10/10/2001 | 10/10/2001 | P | PART |
Tony Young
|
|
|
see John on schedule issues 10/9/2001 9:08:25 AMok to start puting shelves 8' or less 10/10/2001 4:37:35 PM
|
BLD-Conference | 10/2/2001 | 10/2/2001 | 10/2/2001 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 10:00:42. Contact: ###-####.
schedule issues 10/2/2001 2:46:24 PM
|
BLD-Wall cover | 9/18/2001 | 9/19/2001 | 9/19/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/18/2001 at 12:11:04. Contact: ###-####.
T.I. bp # 01-00812 for framing on interior is ok also 9/19/2001 10:31:22 AM
|
BLD-Framing/Rough-in | 9/6/2001 | 9/7/2001 | 9/7/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/06/2001 at 17:03:19. Contact: ###-####.
int. and ext. metal stud walls ok to cover one side only on north end of building, need arch approval as built or change per plan, trades not signed off yet 9/10/2001 8:23:03 AM
|
BLD-Other | 8/24/2001 | 8/24/2001 | 8/24/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/24/2001 at 08:43:06. Contact: ###-####.center masonary wall, 2nd lift, ok to grout 8/24/2001 4:30:24 PM
|
BLD-Other | 8/20/2001 | 8/20/2001 | 8/20/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/20/2001 at 07:50:39. Contact: ###-####.
int. masonary wall 1st lift, verbal corrections, pending s. i. report 8/20/2001 4:16:03 PM
|
BLD-Foundation | 8/3/2001 | 8/7/2001 | 8/7/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 08/03/2001 at 09:33:34. Contact: ###-####.
|
BLD-Foundation | 8/3/2001 | 8/6/2001 | 8/6/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/03/2001 at 12:37:12. Contact: ###-####.verbal corrections on corner laps, pending si report 8/6/2001 11:37:10 AM
|
BLD-Foundation | 8/2/2001 | 8/2/2001 | 8/2/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 11:08:19. Contact: ###-####.already poured, si was on site, pending rpt 8/6/2001 8:11:08 AM
|
BLD-Footing | 8/1/2001 | 8/1/2001 | 8/1/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/01/2001 at 10:49:22. Contact: ###-####.
si on job 8/2/2001 9:56:54 AM
|
BLD-Foundation | 7/30/2001 | 7/30/2001 | 7/30/2001 | P | PART |
Tony Young
|
|
|
John ###-####
special on site 7/31/2001 9:21:57 AM
|
BLD-Foundation | 7/27/2001 | 7/27/2001 | 7/27/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/27/2001 at 10:21:18. Contact: ###-####.pend. si report 7/27/2001 4:23:15 PM
|
BLD-Foundation | 7/26/2001 | 7/26/2001 | 7/26/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/26/2001 at 08:40:35. Contact: ###-####.
east found. wall //pending s i report 7/26/2001 3:37:35 PM
|
BLD-Foundation | 7/24/2001 | 7/25/2001 | 7/25/2001 | P | PART |
Tony Young
|
|
|
part of west stem wall, ok pending s. i. report 7/25/2001 4:40:37 PM
|
BLD-Foundation | 7/23/2001 | 7/24/2001 | 7/24/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/23/2001 at 12:50:03. Contact: ###-####.wip, pend. si rpt 7/24/2001 4:07:08 PM
|
BLD-Footing | 7/20/2001 | 7/23/2001 | 7/23/2001 | A | PART |
Tony Young
|
|
|
###-####
met w/ John, job super, he informed me that the s. i. had approved job to pour, I looked at job and found short rebar laps, plants in ftgs, to close rebar clearances to earth, sluff yhat needed to be cleaned out, etc.// talked w/ dave w/ mti the s. i. about what I found, he said he would verify corrections, also t/w tony the concrete sub, he had his men fixing problems when I left, ok to pour after corrections are made, pending s. i. report 7/23/2001 10:41:09 AM
|