BLD-Final | 6/7/2001 | 6/8/2001 | 6/8/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/07/2001 at 21:14:53. Contact: ###-####. ok for perm occ 6/8/2001 2:12:13 AM
|
FIRE-Final Inspection | 6/7/2001 | 6/8/2001 | 6/8/2001 | P | PASS |
Joe Tawney
|
|
|
Reinsp OK for permanant occupancy and Assembly permit 6/8/2001 2:10:22 PM
|
Permanent Occupancy | | 6/8/2001 | 6/8/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 6/5/2001 | 6/6/2001 | 6/6/2001 | P | FAIL |
Joe Tawney
|
|
|
###-####. Final Fail C/N issued 6/6/2001 1:54:36 PM
|
BLD-Final | 6/4/2001 | 6/5/2001 | 6/5/2001 | P | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/04/2001 at 22:17:38. Contact: .
|
BLD-Footing | 5/31/2001 | 6/1/2001 | 6/1/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 05/31/2001 at 13:32:24. Contact: ###-####. FLAT WORK 6/1/2001 2:43:47 PM
|
BLD-Footing | 5/29/2001 | 5/30/2001 | 5/30/2001 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/29/2001 at 13:10:45. Contact: ###-####.left note on job card to recall when someone is there. 12/30/2001 12:29:35 PM
|
FIRE-Conference | 5/29/2001 | 5/30/2001 | 5/30/2001 | A | PASS |
Joe Tawney
|
|
|
Conf with owner on life safety issues on permit 5/30/2001 10:45:49 AM
|
BLD-Framing/Rough-in | 5/21/2001 | 5/22/2001 | 5/22/2001 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 05/21/2001 at 19:12:24. Contact: ###-####. need elec ri and plumb ri ok to cover bath and hall after rough ins 5/22/2001 12:00:54 PM
|