BLD-Final | 6/6/2001 | 6/7/2001 | 6/7/2001 | A | PASS |
Russ Owen
|
|
|
Chuck ###-#### lc issued. 1/7/2002 10:25:27 AM
|
BLD-Energy code compliance | 5/10/2001 | 5/10/2001 | 5/10/2001 | P | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 5/10/2001 | 5/10/2001 | 5/10/2001 | P | CANC |
Dave Hannah
|
|
|
Chuch ###-#### 5/10/2001 1:12:35 PM
|
BLD-Wall cover | 5/1/2001 | 5/2/2001 | 5/2/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 17:30:58. Contact: .
|
BLD-Energy code compliance | 4/26/2001 | 4/26/2001 | 4/26/2001 | P | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Energy code compliance | 4/25/2001 | 4/25/2001 | 4/25/2001 | P | PART |
Dave Hannah
|
|
|
Chuck ###-####seal package ok 4/25/2001 2:43:13 PM
|
BLD-Framing/Rough-in | 4/25/2001 | 4/25/2001 | 4/25/2001 | P | FAIL |
Dave Hannah
|
|
|
chuck ###-#### 4/25/2001 2:38:46 PM shear nailing failed need to add staples c/n on frame ok to insulate 4/25/2001 2:42:30 PM
|
BLD-Framing/Rough-in | 4/24/2001 | 4/24/2001 | 4/24/2001 | P | NR |
Russ Owen
|
|
|
###-#### needs mec completed and inspected,also plm inspected, c/n posted. 11/24/2001 3:37:33 PM
|
BLD-Foundation | 4/3/2001 | 4/4/2001 | 4/4/2001 | P | PART |
Russ Owen
|
|
|
###-####
|
BLD-Footing | 4/3/2001 | 4/3/2001 | 4/3/2001 | P | PART |
Jim Sly
|
|
|
dane-- ###-#### ft
|