Permit Information
Permit NumberBLD01-00781
StatusFinaled
Name TERTELING TRUST NO 8
Site Address 7700 W FAIRVIEW AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
Interior remodel to an existing 3,337 sq. ft. bank building and constructing a new 317 sq.ft. addition per approved plans on file. New total will be 3,654 sq. ft. Work to include miscellaneous interior demolition work, new addition with concrete slab floor- CMU walls - and wood framed roof to existing structure, new accessible restrooms, accessible upgrades including providing an accessible entrance, new interior walls, new interior doors, interior finish, new draft stops, a new exterior landing at new exterior door, mechanical work including new rooftop HVAC unit, plumbing work, and electrical work. West exterior wall of building is existing one-hour rated per location on property. Unprotected openings are allowed. This project will be done in phases. A new Certificate of Occupancy is to be issued for this tenant when ALL phases are completed and approved. Planning approval per DRH01-00039. (P.C.#0265-01) JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/9/200110/11/200110/11/2001APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/09/2001 at 10:35:44. Contact: ###-####. ok for perm occ 10/11/2001 10:41:23 AM
Permanent Occupancy 10/11/200110/11/2001 DONE
Details
FIRE-Final Inspection10/9/200110/10/200110/10/2001ACANC
DetailsTroy Cobbley
OK for perm occ. under 406 10/10/2001 3:10:32 PM 10/10/2001 3:11:20 PM
FIRE-Final Inspection10/3/200110/4/200110/4/2001AFAIL
DetailsJoe Tawney
See c/n 10/4/2001 11:03:40 AM
BLD-Final10/2/200110/3/200110/3/2001PFAIL
DetailsDave Hannah
###-#### needs fire life safty sing off 10/3/2001 1:30:43 PM
FIRE-Final Inspection10/2/200110/3/200110/3/2001ANH
DetailsJoe Tawney
###-####. Contractor and plans not on site 10/3/2001 1:32:36 PM
FIRE-Conference9/4/20019/5/20019/5/2001APASS
DetailsJoe Tawney
Conf with contr on exit signs and door hdwre 9/5/2001 11:26:20 AM
BLD-Framing/Rough-in9/4/20019/4/20019/4/2001PPASS
DetailsDave Hannah
###-#### kelly r/i
FIRE-Conference9/4/20019/4/20019/4/2001PCANC
DetailsRick Jackson
kelly ###-#### fire for conf Kelly to reschedule for 9/5/01 when Joe is back 9/4/2001 10:15:00 AM
BLD-Framing/Rough-in8/9/20018/9/20018/9/2001PPASS
DetailsDave Hannah
fr insp-- kelly ###-#### engineering revesion on masonry lintal to micro lame ok seismic pods and wiring on ext supended ceiling ok but needs rivits around out side steel stud wall ent ok 8/9/2001 2:55:53 PM
BLD-Framing/Rough-in7/18/20017/18/20017/18/2001PPASS
DetailsDave Hannah
###-#### ph 1 bath room area ok to cover 7/18/2001 3:28:45 PM
BLD-Framing/Rough-in7/11/20017/12/20017/12/2001APASS
DetailsDave Hannah
###-#### roof framing and sheating 7/12/2001 9:45:58 AM
BLD-Framing/Rough-in6/22/20016/25/20016/25/2001APASS
DetailsDave Hannah
Scheduled by Inspector: 425 On 6/22/2001 11:07:05 AM 6/25/2001 10:30:10 AM rebar and masonry top 5ft ok to grout 6/25/2001 10:30:48 AM
BLD-Framing/Rough-in6/22/20016/22/20016/22/2001APASS
DetailsDave Hannah
Added by Inspector: 425 On 6/22/2001 11:05:47 AM rebar and cmu 4-8 ft ok to grout
BLD-Framing/Rough-in6/21/20016/22/20016/22/2001PPASS
DetailsDave Hannah
###-#### Kelly masonry
BLD-Framing/Rough-in6/21/20016/21/20016/21/2001PPART
DetailsDave Hannah
masonry Kelly ###-#### masonry wall 0-4 ft ok to grout 6/21/2001 2:32:05 PM
BLD-Foundation6/6/20016/7/20016/7/2001APASS
DetailsTom Arcoraci
###-####
BLD-Footing6/6/20016/6/20016/6/2001PPASS
DetailsTom Arcoraci
Added by Inspector: 408 On 6/6/2001 2:19:11 PM
BLD-Foundation6/5/20016/6/20016/6/2001ANR
DetailsTom Arcoraci
FOUND KELLY- ###-####