BLD-Final | 6/25/2001 | 6/25/2001 | 6/25/2001 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 06/25/2001 at 08:24:19. Contact: ###-####.
|
BLD-Footing | 5/29/2001 | 5/29/2001 | 5/29/2001 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/29/2001 at 07:31:31. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/30/2001 | 4/30/2001 | 4/30/2001 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/30/2001 at 08:10:36. Contact: ###-####. may req 1 addnl post at east side as shown on plans,owner will have beam calc. 11/30/2001 3:22:31 PM
|
BLD-Footing | 4/5/2001 | 4/6/2001 | 4/6/2001 | A | PASS |
Russ Owen
|
|
|
ft insp john =###-#### 4 footings ok. 4/6/2001 11:08:39 AM
|