Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD01-00809
StatusFinaled
Name SHORELINE PLAZA INC
Site Address 617 S 13TH ST
Project NameSHORELINE APARTMENTS
Customer Number 
ePlanReviewNo
Description
Section 2 of 2, western section * A two hour area separation wall will divide this 54 unit apartment building into two separate buildings. This portion is 3 stories with mezzanine, wood framed, 15,9400 sq.ft. 18 unit apartment building, above a three hour occupancy separation per UBC Section 311.2.2.1. All construction per the approved plans, attached comment list and CABO/ANSI A117.1. NOTE: This building has a NFPA 13-R residential fire sprinkler system and can not be used for any code reductions. Refer to BLD 01- 00808 for other side of the area separation wall and BLD 01-00011 for parking structure permit. DRH-00-237 & CUP-00-00124 MJP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 8/27/20028/27/2002 DONE
Details
BLD-Final8/20/20028/20/20028/20/2002PPART
DetailsCarl Dependahl
Apts ok....awaiting flood plain cert approval by Pub.Wks...affects garage only (Parking structure/foundation building should probably be considered as flood resistant construction.)
BLD-Final8/16/20028/19/20028/19/2002PPASS
DetailsCarl Dependahl
###-####
BLD-Final8/16/20028/16/20028/16/2002PCANC
DetailsCarl Dependahl
DARRELL; Phone #: ###-####
BLD-Final5/15/20025/15/20025/15/2002PPART
DetailsCarl Dependahl
c/n, ok for t/o 5/15/2002 5:57:44 PM
BLD-Final5/14/20025/14/20025/14/2002PCANC
DetailsRuss Owen
###-####
BLD-Final5/14/20025/14/20025/14/2002PNR
DetailsCarl Dependahl
Scheduled by Inspector: 407 On 5/14/2002 4:44:41 PM
FIRE-Final Inspection5/10/20025/10/20025/10/2002PPASS
DetailsRick Jackson
Scheduled by Inspector: 409 On 5/10/2002 4:21:44 PM
BLD-Conference4/24/20024/24/20024/24/2002PPASS
DetailsCarl Dependahl
ok to lift hold 4/24/2002 7:26:39 PM
BLD-Energy code compliance1/30/20021/30/20021/30/2002PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 1/30/2002 5:41:51 PM
BLD-Framing/Rough-in1/22/20021/22/20021/22/2002APART
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 1/22/2002 9:18:57 AM ...complete fireblocks,,draftstops, 1hr fireseals, ok to insul. 1/22/2002 5:31:02 PM
BLD-Framing/Rough-in1/11/20021/14/20021/14/2002ACANC
DetailsCarl Dependahl
###-#### darrell fr
BLD-Framing/Rough-in1/14/20021/14/20021/14/2002PNR
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 1/14/2002 11:53:19 AM
BLD-Aging Inspection12/18/200112/18/200112/18/2001 NR
DetailsCarl Dependahl
apts, wip 12/18/2001 4:40:35 PM
BLD-Conference10/15/200110/15/200110/15/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/15/2001 4:39:30 PM pre-con w/ supt.
BLD-Conference9/7/20019/10/20019/10/2001PPASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 9/7/2001 4:53:45 PM Darrel ###-#### rec'd detail for thru penetrations at floor...will consult plan review 9/10/2001 3:53:44 PM
BLD-Conference9/7/20019/7/20019/7/2001PPASS
DetailsCarl Dependahl
###-#### re pt deck, need all spec insp & eng's reports. 9/7/2001 4:52:54 PM
BLD-Conference8/29/20018/30/20018/30/2001APART
DetailsCarl Dependahl
###-#### w supt, need engs ok re pt deck, details for "shaft" 8/30/2001 5:02:05 PM
BLD-Conference8/9/20018/10/20018/10/2001ACANC
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 8/9/2001 6:13:23 PM
BLD-Conference8/9/20018/10/20018/10/2001APART
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 8/9/2001 6:00:29 PM DARREL ###-####...need eng's ok for pt deck.. 8/10/2001 11:23:45 AM
BLD-Conference8/9/20018/9/20018/9/2001APASS
DetailsCarl Dependahl
###-#### darrell PRECON 8/9/2001 6:01:35 PM