BLD-Final | 10/3/2001 | 10/4/2001 | 10/4/2001 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/03/2001 at 15:30:53. Contact: ###-####. c-of-c issued. 10/4/2001 1:35:11 PM
|
BLD-Final | 8/13/2001 | 8/13/2001 | 8/13/2001 | P | CANC |
Alan Hauser
|
|
|
CLYDE- ###-#### FN--GAR DOOR CODE IS 4268wanted electrical final 8/13/2001 2:51:29 PM
|
BLD-Energy code compliance | 6/21/2001 | 6/22/2001 | 6/22/2001 | A | PASS |
Jim Sly
|
|
|
lori ###-#### energy code
|
BLD-Framing/Rough-in | 6/21/2001 | 6/22/2001 | 6/22/2001 | A | PASS |
Jim Sly
|
|
|
shear lori ###-#### fr
|
BLD-Framing/Rough-in | 6/18/2001 | 6/19/2001 | 6/19/2001 | A | FAIL |
Dave Hannah
|
|
|
please call Laurie at ###-#### mec rough in not complete no city approved plans or truss engin on site 6/19/2001 9:21:03 AM
|
BLD-Framing/Rough-in | 6/19/2001 | 6/19/2001 | 6/19/2001 | P | FAIL |
Dave Hannah
|
|
|
framing and shear inspection Laurie ###-#### both shear and framing have c/n items 6/19/2001 2:44:58 PM
|
BLD-Foundation | 5/1/2001 | 5/1/2001 | 5/1/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 07:21:03. Contact: ###-####.
|
BLD-Footing | 4/30/2001 | 4/30/2001 | 4/30/2001 | P | PART |
Russ Owen
|
|
|
ft insp jim-- ###-#### ok no steel in place. 11/30/2001 3:34:44 PM
|