BLD-Final | 7/30/2001 | 7/31/2001 | 7/31/2001 | A | PASS |
Steven Webb
|
|
|
access code 193 ###-#### C. of C #21570 issued 7/31/2001 11:54:34 AM
|
BLD-Final | 7/27/2001 | 7/30/2001 | 7/30/2001 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 07/27/2001 at 16:02:29. Contact: ###-####...door locked, called 7/30/2001 12:29:53 PM
|
BLD-Framing/Rough-in | 6/18/2001 | 6/18/2001 | 6/18/2001 | P | PASS |
Steven Webb
|
|
|
shear wall ###-#### garage---interior shear. 6/18/2001 2:24:21 PM
|
BLD-Energy code compliance | 6/6/2001 | 6/7/2001 | 6/7/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### all c/n items have been completed ok to cover 6/7/2001 9:27:04 AM
|
BLD-Conference | 6/5/2001 | 6/5/2001 | 6/5/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/5/2001 1:35:54 PM w/ supt & Pat re c/n...I didn't do reinsp, check at office if questions.
|
BLD-Framing/Rough-in | 6/4/2001 | 6/5/2001 | 6/5/2001 | A | FAIL |
Russ Owen
|
|
|
fr pat ###-#### c/n posted. 1/5/2002 1:26:24 PM
|
BLD-Conference | 6/4/2001 | 6/4/2001 | 6/4/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/4/2001 9:22:24 AM w/ Pat re c/n...need air seal at boots & other air leak points per BEC.
|
BLD-Framing/Rough-in | 6/1/2001 | 6/1/2001 | 6/1/2001 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 06/01/2001 at 05:02:04. Contact: ###-####....c/n, straps, shear wall, air seal, truss layout. ok to insul 6/1/2001 3:51:04 PM
|
BLD-Framing/Rough-in | 5/21/2001 | 5/21/2001 | 5/21/2001 | P | PASS |
Steven Webb
|
|
|
shear Pat ###-#### ok to side 5/21/2001 2:22:25 PM
|
BLD-Foundation | 4/23/2001 | 4/24/2001 | 4/24/2001 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/23/2001 at 15:02:25. Contact: ###-####.wip 4/24/2001 12:05:46 PM
|
BLD-Footing | 4/23/2001 | 4/23/2001 | 4/23/2001 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/23/2001 at 07:08:13. Contact: ###-####. wip 4/23/2001 11:41:21 AM
|