Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-00834
StatusFinaled
Name ADVANTEST AMERICA INC
Site Address 1501 S FEDERAL WAY (1ST FLR)
Project NameVIEW POINT
Customer Number 
ePlanReviewNo
Description
(ADVANTEST AMERICA, INC - EXTERIOR WORK) This building is NOT fire sprinklered. To construct a 135 square foot equipment shelter, a 360 square foot loading dock, and a 9,700 square foot access road on the South side of an existing office building. A new door opening in the existing building's masonry exterior wall, including a structural header, is also being provided. The equipment shelter has masonry walls, a concrete floor, and wood roof. The South, East, and West walls are required to be of 1-hr fire-resistive construction with parapets at least 30 inches high above the roof. Openings in these walls, if provided, shall be protected by fire assemblies having a 45 minute fire-protection rating. All work shall comply with the approved drawings, engineering, and plan review conditions on file. The interior tenant improvement was done under permit BLD00-03386. PC-0274-01 DRH01-00021 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/18/20019/18/20019/18/2001PPASS
DetailsJim Storey
fn greg-- ###-#### final ok special insp. archived card with contractor. 9/18/2001 4:59:44 PM
BLD-Final9/12/20019/13/20019/13/2001AFAIL
DetailsJim Storey
greg ###-#### call 1st before insp -fnneed special final/mech/ and door closer. 9/13/2001 9:34:47 AM
FIRE-Final Inspection8/14/20018/14/20018/14/2001PPASS
DetailsRick Jackson
###-####
BLD-Framing/Rough-in8/6/20018/6/20018/6/2001AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/06/2001 at 07:30:06. Contact: ###-####. support maim grids with trapizes not duct work. 8/6/2001 9:20:21 AM
BLD-Foundation7/19/20017/19/20017/19/2001PPART
DetailsJim Storey
late pm ###-#### full height grout pour special insp req. pending report. 7/19/2001 3:28:17 PM
BLD-Foundation7/2/20017/3/20017/3/2001AFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 07/02/2001 at 13:25:53. Contact: ###-####. need eng to inspect and verify rabar poured withot inspection 7/2/2001 10:59:07 PM 7/2/2001 10:59:30 PM
BLD-Framing/Rough-in7/2/20017/3/20017/3/2001AFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 07/02/2001 at 13:23:43. Contact: ###-####. working past scope of work on permit SWO ISSUED
7/2/2001 11:02:04 PM