Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-00843
StatusFinaled
Name ST LUKES
Site Address 190 E BANNOCK ST
Project NameST LUKES-WEST WING
Customer Number21-505
ePlanReviewNo
Description
(ST LUKES-WEST WING-2ND FLOOR) To remodel the North portion of the West Wing previously demolished under BLD00-00081& receiving structural integrity upgrade for seismic zone under BLD00-02394. Area of remodel approximately 3,500 sq.ft. of north 1/2 of the 2nd floor for patient rooms & support areas per approved plans on file. NOTE: This building is fully fire sprinklered. A "Letter of Completion / Compliance is required for this project portion. (P.C.#01-276)/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection6/17/20056/17/20056/17/2005 PASS
DetailsDave Hannah
DOC - Permit Finaled6/17/20056/17/20056/17/2005PPASS
DetailsDave Hannah
BLD-Aging Inspection3/14/20053/14/20053/14/2005 PASS
DetailsDave Hannah
BLD-Aging Inspection10/7/200410/7/200410/7/2004 PASS
DetailsDave Hannah
BLD-Aging Inspection8/5/20048/5/20048/5/2004 PART
DetailsDave Hannah
BLD-Conference6/4/20046/4/20046/4/2004PDONE
DetailsDave Hannah
BLD-Aging Inspection6/3/20046/3/20046/3/2004 DONE
DetailsDave Hannah
BLD-Aging Inspection3/23/20043/23/20043/23/2004 PASS
DetailsDave Hannah
wip 3/23/2004 8:09:10 AM
BLD-Aging Inspection1/22/20041/22/20041/22/2004 PASS
DetailsDave Hannah
wip 1/23/2004 8:26:02 AM
BLD-Aging Inspection11/18/200311/18/200311/18/2003 PART
DetailsDave Hannah
wip 11/18/2003 8:23:16 AM
BLD-Aging Inspection9/15/20039/15/20039/15/2003 DONE
DetailsDave Hannah
BLD-Final7/9/20037/10/20037/10/2003APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 7/9/2003 at 7:46:14 AM. Contact: ###-####...north 1/2 ok for occupancy...need all trades finalled. 7/10/2003 12:22:19 PM
BLD-Aging Inspection7/9/20037/9/20037/9/2003 DONE
DetailsCarl Dependahl
ok, wip, has c/n & t/o...phased project. 7/9/2003 8:09:46 AM
BLD-Conference5/8/20035/9/20035/9/2003APASS
DetailsCarl Dependahl
Kelly ###-####, advised supt. re temp occ. req's & phased project. 5/9/2003 10:39:25 AM
BLD-Final5/8/20035/9/20035/9/2003AFAIL
DetailsCarl Dependahl
###-####, c/n complete misc finish items, ok for t/o. 5/9/2003 10:41:28 AM
BLD-Conference5/8/20035/8/20035/8/2003APASS
DetailsCarl Dependahl
w/ rick j. 5/8/2003 1:39:12 PM
BLD-Final5/8/20035/8/20035/8/2003PNR
DetailsCarl Dependahl
kelly; Phone #: ###-#### Internet Inspection Request from: Annette Moore...plbg? etc?5/8/2003 3:56:43 PM 5/8/2003 3:59:54 PM
FIRE-Final Inspection5/8/20035/8/20035/8/2003APASS
DetailsRick Jackson
phase A okay 5/8/2003 9:37:58 AM
FIRE-Final Inspection5/6/20035/7/20035/7/2003PNR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 5/6/2003 at 11:42:38 AM. Contact: ###-####. alarm system not ready; penetrations in corridor walls 5/7/2003 3:02:28 PM
BLD-Framing/Rough-in4/25/20034/25/20034/25/2003PNR
DetailsJim Storey
DAN CELING; Phone #: ###-#### Internet Inspection Request from: Darla Downs need rick jackson to do fire sprk. rough in before ceilling insp. left message. 4/25/2003 2:20:10 PM
BLD-Aging Inspection4/11/20034/11/20034/11/2003 PASS
DetailsCarl Dependahl
WIP; rec'd eng's approval for seismic upgrade; Need all other finals performed. 4/11/2003 2:10:46 PM
BLD-Aging Inspection1/28/20031/28/20031/28/2003 PASS
DetailsCarl Dependahl
still need eng's review/ok...spoke w/ Dan, new supt. 1/29/2003 9:22:06 AM
BLD-Aging Inspection1/7/20021/7/20021/7/2002 NR
DetailsCarl Dependahl
wip, need eng's report for complee final 1/7/2002 5:04:06 PM
BLD-Framing/Rough-in1/7/20021/7/20021/7/2002PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 1/7/2002 5:05:22 PM walls & grid ok, chk all firestops at final, need eng's report/approval re seismic upgrade
BLD-Wall cover11/2/200111/5/200111/5/2001ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/02/2001 at 08:14:35. Contact: ###-####....keep c/ n, complete firestops at corridor walls & fl/clg 11/5/2001 11:54:23 AM
BLD-Framing/Rough-in10/26/200110/26/200110/26/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/26/2001 11:31:31 AM 2nd fl, add wires & spacers at grid, complete firestops at corridor walls, verify hvac r/i.
BLD-Conference10/5/200110/5/200110/5/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/5/2001 3:12:10 PM ok to delete ts cols per arch as not used for hvac unit support
BLD-Wall cover9/25/20019/26/20019/26/2001AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/25/2001 at 15:39:31. Contact: ###-####. c/n re shafts, col's not protected, corridor wall const; obtain complete hvac r/i ok. 9/26/2001 3:31:20 PM
BLD-Framing/Rough-in9/24/20019/25/20019/25/2001ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/24/2001 at 13:41:39. Contact: ###-####.