Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-00846
StatusFinaled
Name ED HUMPHRIES
Site Address 4869 -4875 W BLOOM ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 1886 sq. ft. single story DUPLEX (943 sq. ft. two bedroom, two bathroom units) with a attached 250 sq. ft. single car garage for each unit. There is a 2080 sq. ft. three car/rv garage detached. NOTE: THIS UNIT IS BEING CONSTRUCTED AS A DUPLEX AND CANNOT BE CONVERTED OR SOLD AS INDIVIDUAL UNITS OR TOWNHOUSES. Per approved plans, CAA01-00005 per Susan Riggs and requirement list. PC#243 (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/9/200110/10/200110/10/2001PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/09/2001 at 15:23:45. Contact: ###-####. c.c # 21700 issued 10/10/2001 2:46:29 PM
BLD-Framing/Rough-in9/10/20019/11/20019/11/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 09/10/2001 at 13:02:54. Contact: ###-####.
insulation ok, (wip) need to see int. drywall shear 9/11/2001 10:24:30 AM
BLD-Framing/Rough-in8/31/20018/31/20018/31/2001APART
DetailsTony Young
Added by Inspector: 415 On 8/31/2001 9:20:54 AM shop framing ok, need to see int. shear later
BLD-Framing/Rough-in8/30/20018/31/20018/31/2001APART
DetailsTony Young
fr bill ###-####--shear nail
only part of int. shear done, need to see the rest of int. of duplex later 2day, and shop int. shear 8/31/2001 9:18:30 AM
BLD-Other8/31/20018/31/20018/31/2001PPART
DetailsTony Young
int. shear on duplex ok, wip 8/31/2001 3:25:25 PM
BLD-Energy code compliance8/27/20018/27/20018/27/2001PPART
DetailsTony Young
###-####///need to see int. shear yet, ok to rock 8/27/2001 4:00:26 PM
BLD-Framing/Rough-in8/23/20018/24/20018/24/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 08/23/2001 at 13:39:15. Contact: ###-####.duplex only,,c/n posted, ok to insulate pending mech. rouph pass 8/24/2001 11:13:17 AM
BLD-Framing/Rough-in8/16/20018/17/20018/17/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 08/16/2001 at 14:02:48. Contact: ###-####.
ext. shear ok 8/17/2001 11:10:28 AM
BLD-Foundation6/26/20016/27/20016/27/2001APART
DetailsTony Young
re-bar Brent ###-####
poured 6/27/2001 11:07:02 AM
BLD-Footing6/25/20016/25/20016/25/2001PPART
DetailsTony Young
Bill ###-####
wip, verbal corrections 6/25/2001 2:14:04 PM
BLD-Conference6/20/20016/21/20016/21/2001APASS
DetailsTony Young
via phone, procedure, problem w/ property pin, etc 6/21/2001 10:46:18 AM