BLD-Aging Inspection | 10/22/2001 | 10/22/2001 | 10/22/2001 | | PASS |
Jim Sly
|
|
|
|
BLD-Final | 10/22/2001 | 10/22/2001 | 10/22/2001 | A | PASS |
Jim Sly
|
|
|
Added by Inspector: 316 On 10/22/2001 9:24:20 AM previously passed by 420
|
BLD-Final | 10/22/2001 | 10/22/2001 | 10/22/2001 | A | PASS |
Jim Sly
|
|
|
Added by Inspector: 316 On 10/22/2001 10:47:38 AM
|
BLD-Aging Inspection | 8/20/2001 | 8/20/2001 | 8/20/2001 | | PASS |
Jim Sly
|
|
|
C/C previously issued by 420 8/20/2001 8:24:56 AM
|
BLD-Final | 6/15/2001 | 6/18/2001 | 6/18/2001 | P | PASS |
Steven Webb
|
|
|
###-#### C/N #20432 issued. 6/18/2001 1:11:10 PM
|
BLD-Energy code compliance | 5/8/2001 | 5/9/2001 | 5/9/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/08/2001 at 19:55:35. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/8/2001 | 5/9/2001 | 5/9/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/08/2001 at 19:54:52. Contact: ###-####.
|
BLD-Energy code compliance | 5/8/2001 | 5/8/2001 | 5/8/2001 | P | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Framing/Rough-in | 5/8/2001 | 5/8/2001 | 5/8/2001 | P | FAIL |
Russ Owen
|
|
|
c/n posted to correct 1 prior c/n item. 12/8/2001 5:42:52 PM
|
BLD-Framing/Rough-in | 5/7/2001 | 5/7/2001 | 5/7/2001 | P | PASS |
Dave Hannah
|
|
|
JP ###-#### shear wall
|
BLD-Framing/Rough-in | 5/7/2001 | 5/7/2001 | 5/7/2001 | P | FAIL |
Dave Hannah
|
|
|
jp ###-#### c/n on site ok to insulate after mec rought in 5/7/2001 3:54:01 PM
|
BLD-Foundation | 4/17/2001 | 4/18/2001 | 4/18/2001 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Footing | 4/16/2001 | 4/17/2001 | 4/17/2001 | A | PART |
Jim Sly
|
|
|
###-####
|